LX: OPM_LPA_11U_5K0_10K_1US_V021
14
GE DE LanPro-11U UPS: Installation / User Manual 2.1 (US)
GE Digital Energy
g
4.4.3.2
Output voltage 120Vac split-phase
1.
The factory setting of the output tap (208Vac) has to be changed to 240Vac. Please refer to fig. 12 and 12a.
Proceed as follows:
1.1 Remove the yellow wire L from faston 67 (connect) and place this wire on faston 65 (park).
1.2 Remove the brown wire F from faston 66 (park) and place this wire on faston 67 (connect).
2.
Connect the load wires between the terminals 1 (L1) and 2 (N) (120V), and between the terminals 3 (N) and 4
(L2) (120V). Connect the ground wire to terminal 5. Ground connection is essential! Do not remove the link
between terminals 2 and 3. See figure 13.
3.
Return to either 4.4.1.1 step 5 or 4.4.1.2 step 5
Figure 13.
LanPro
®
5/6/8/10-11U:
120 Vac split-phase output connection
1
2
3
4
5
6
7
8
gnd
L2
N
gnd
L1
120V
120V
Figure 12. LanPro 5/6/8/10-11U:
Output tap change
Figure 12a. LanPro 5/6/8/10-11U:
Rear view
61
72
74
73
65
66
67
Output tap factory setting: 208 Volt
Output tap changed to 240 Volt
1113-D
O
(park)
65
(park)
66
(connect)
67
F
L
64
62
63
32V
88V
120V
PCB1113-C
T1
O
(park)
65
(park)
66
(connect)
67
F
L
64
62
63
32V
88V
120V
PCB1113-C
1113-D
T1