![GE Krautkramer USM 35X Скачать руководство пользователя страница 70](http://html.mh-extra.com/html/ge/krautkramer-usm-35x/krautkramer-usm-35x_operators-manual_128397070.webp)
5-22
Issue 01, 04/2005
Krautkramer USM 35X
Operation
Calibrating the USM 35X
Higher material velocity
Due to the V-path error, a higher material velocity than
that of the test material is given during calibration, es-
pecially with small thicknesses. This is typical of dual-
element (TR) probes and serves for compensation of
the V-path error.
With small wall thicknesses, the above-described effect
leads to an echo amplitude drop which has to be espe-
cially taken into account with thicknesses less than
2 mm/0.08".
A stepped reference block having different wall thick-
nesses is required for calibration. The wall thicknesses
must be selected so that they cover the expected read-
ings.
Calibration process:
We recommend to use the semiautomatic calibration
function for the calibration with T/R probes.
– Set the required test range.
– Increase the probe delay (
P-DELAY
) until the two
calibration lines are displayed within the range.
– Set the pulser and receiver functions according to
the probe used and the test application.
– Set the function
TOF
(function group
MEAS
) to
flank
.
– Vary the gain so that the highest echo reaches
approximately the full screen height.
– Set the gate threshold to the required height for
measuring the sound paths at the echo flanks.
– Select the function group
CAL
.
– Enter the distances of the two calibration echoes in
S-REF1
and
S-REF2
.
– Position the gate (function
aSTART
) on the first
calibration echo.
– Press
to record the first calibration echo.
– Couple the probe to the calibration block containing
the second calibration line, and set the height so that
it’s about as high as the first calibration echo.
– Move the gate to the second calibration echo.
5-22
Issue 01, 04/2005
Krautkramer USM 35X
Operation
Calibrating the USM 35X
Higher material velocity
Due to the V-path error, a higher material velocity than
that of the test material is given during calibration, es-
pecially with small thicknesses. This is typical of dual-
element (TR) probes and serves for compensation of
the V-path error.
With small wall thicknesses, the above-described effect
leads to an echo amplitude drop which has to be espe-
cially taken into account with thicknesses less than
2 mm/0.08".
A stepped reference block having different wall thick-
nesses is required for calibration. The wall thicknesses
must be selected so that they cover the expected read-
ings.
Calibration process:
We recommend to use the semiautomatic calibration
function for the calibration with T/R probes.
– Set the required test range.
– Increase the probe delay (
P-DELAY
) until the two
calibration lines are displayed within the range.
– Set the pulser and receiver functions according to
the probe used and the test application.
– Set the function
TOF
(function group
MEAS
) to
flank
.
– Vary the gain so that the highest echo reaches
approximately the full screen height.
– Set the gate threshold to the required height for
measuring the sound paths at the echo flanks.
– Select the function group
CAL
.
– Enter the distances of the two calibration echoes in
S-REF1
and
S-REF2
.
– Position the gate (function
aSTART
) on the first
calibration echo.
– Press
to record the first calibration echo.
– Couple the probe to the calibration block containing
the second calibration line, and set the height so that
it’s about as high as the first calibration echo.
– Move the gate to the second calibration echo.
Содержание Krautkramer USM 35X
Страница 8: ...0 8 Issue 01 04 2005 Krautkramer USM 35X ...
Страница 9: ...Krautkramer USM 35X Issue 01 04 2005 1 1 Introduction 1 Introduction 1 ...
Страница 20: ...1 12 Issue 01 04 2005 Krautkramer USM 35X ...
Страница 21: ...Krautkramer USM 35X Issue 01 04 2005 2 1 Standard package and accessories 2 Standard package and accessories 2 ...
Страница 27: ...Krautkramer USM 35X Issue 01 04 2005 3 1 Initial start up 3 Initial start up 3 ...
Страница 35: ...Krautkramer USM 35X Issue 01 04 2005 4 1 Principles of operation 4 Principles of operation 4 ...
Страница 49: ...Krautkramer USM 35X Issue 01 04 2005 5 1 Operation 5 Operation 5 ...
Страница 130: ...5 82 Issue 01 04 2005 Krautkramer USM 35X ...
Страница 131: ...Krautkramer USM 35X Issue 01 04 2005 6 1 Documentation 6 Documentation 6 ...
Страница 135: ...Krautkramer USM 35X Issue 01 04 2005 7 1 Maintenance and care 7 Maintenance and care 7 ...
Страница 148: ...7 14 Issue 01 04 2005 Krautkramer USM 35X ...
Страница 149: ...Krautkramer USM 35X Issue 01 04 2005 8 1 Interfaces and peripherals 8 Interfaces and peripherals 8 ...
Страница 177: ...Krautkramer USM 35X Issue 01 04 2005 9 1 Appendix 9 Appendix 9 ...
Страница 190: ...9 14 Issue 01 04 2005 Krautkramer USM 35X ...
Страница 191: ...Krautkramer USM 35X Issue 01 04 2005 10 1 Changes 10 Changes 10 ...
Страница 193: ...Krautkramer USM 35X Issue 01 04 2005 11 1 Index 11 Index 11 ...