background image

NOTICE

Installation safety instructions:
• Contractor responsibility:

• Electrical contractor is responsible for providing and connecting the cables

and configuring the PDB in by-pass mode.

• GEHC is responsible for powering on the system with the UPS in by-pass

mode.

• GEDE is responsible for UPS comissioning.

• After removing the sidewalls of the UPS, make sure that all earth connections

when reassembling, are correctly reattached.

• This UPS is intended for use in a controlled indoor environment free of

conductive contaminants and protected against animals intrusion.

• HIGH GROUND LEAKAGE CURRENT: Ground connection is essential before

connecting to AC input! For Europe only, if a differential breaker is placed on
the hospital main supply, upstream the PDB, the differential shall be set to 300
mA.

• Switching OFF the unit does not isolate the UPS from the utility.
• Do not install the UPS in an excessively humid environment or near water.
• Avoid spilling liquids on or dropping any foreign object into the UPS.
• The unit must be placed in a sufficiently ventilated area; the ambient

temperature should not exceed 104°F (40°C).

• Optimal battery life time is obtained if the ambient temperature does not

exceed 77°F (25°C).

• It is important that air can move freely around and through the unit. Do not

block the air vents.

• Avoid locations in direct sunlight or near heat sources.
• Check local regulations for UPS installation.

 

NOTICE

Storage safety instructions:
• Store the UPS in a dry location; storage temperature must be within –13°F (–

25°C) to 131°F (55°C).

• If the unit is stored for a period exceeding 3 months, the battery must be

recharged periodically (time depending on storage temperature).

 

Electrical Requirements

144

Innova

TM

 IGS 6

5750182-1EN 3

Содержание Innova IGS 6

Страница 1: ...InnovaTM IGS 6 Pre Installation Manual 5750182 1EN 3 2017 General Electric Company All rights reserved...

Страница 2: ...davatelja usluge operatera ili pacijenta us lijed strujnog udara mehani kih ili drugih rizika V STRAHA CS Tento provozn n vod existuje pouze v anglick m jazyce V p pad e extern slu ba z kazn k m pot...

Страница 3: ...ctric shock mechanical or other hazards HOIATUS ET See teenindusjuhend on saadaval ainult inglise keeles Kui klienditeeninduse osutaja n uab juhendit inglise keelest erinevas keeles vastutab klient t...

Страница 4: ...gy a beteg ram t s mechanikai vagy egy b vesz lyhelyzet miatti s r l s t eredm nyezheti A V RUN IS essi j nustuhandb k er a eins f anleg ensku Ef a j nustuveitandi vi skiptamanns arfnast annas tungum...

Страница 5: ...parere utstyret uten at denne serviceh ndboken er lest og forst tt Manglende hensyn til denne advarselen kan f re til at serviceleverand ren operat ren eller pasienten skades p grunn av elektrisk st t...

Страница 6: ...i jezik klijent je du an da obezbedi prevodila ke usluge Ne poku avajte da opravite ure aj ako niste pro itali i razumeli ovo servisno uputstvo Zanemarivanje ovog upozorenja mo e dovesti do povre ivan...

Страница 7: ...potrebuje priro nik v drugem jeziku mora stranka zagotoviti pre vod Ne posku ajte servisirati opreme e tega priro nika niste v celoti prebrali in razumeli e tega opozorila ne upo tevate se lahko zara...

Страница 8: ...for Change Pages 5750182 1EN rev 1 April 7 2017 Initial release of 5750182 1EN 186 5750182 1EN rev 2 September 19 2017 Release after HII review 192 5750182 1EN rev 3 November 6 2017 Post FDR3 release...

Страница 9: ...Page intentionally left blank...

Страница 10: ...nts 29 2 1 1 Presentation of the 3 Rooms 29 2 1 2 Description of the System 30 2 1 3 Dimension Drawings 37 2 1 4 Monitor and Monitor Suspension References 70 2 1 5 System Compatibility 71 2 2 Room Lay...

Страница 11: ...connections 156 5 3 1 MIS Master Interconnect System 156 5 3 2 Cable Channeling 156 5 4 System Cable Information 160 5 4 1 Physical Runs 160 5 5 X Ray ON Lamp Distribution 172 5 6 Ready For X Ray Lamp...

Страница 12: ...s pre installation data such as site preparation prior to the delivery of the Innova System environmental and electrical requirements and some additional planning aids WARNING MAKE SURE THE ROOM PREPA...

Страница 13: ...ke responsibility for the various items during the system installation process To help you in determining these responsibilities review the following checklists with the customer and assign responsibi...

Страница 14: ...responsibility Lateral Gantry cable drape rail s Frontal Gantry baseplate grout Frontal Gantry baseplate Table baseplate if applicable NOTE For systems with Fluoro UPS CE cabinet only It is the custo...

Страница 15: ...air or with oxygen or nitrous oxide Mode of operation Continuous operation with intermittent loading NOTICE The system can only be installed in an anesthetizing location if that location is classifie...

Страница 16: ...ing Dolly See Figure 1 2 Frontal Positioner Gantry on Ship ping Dolly on page 8 2300 90 5 2900 114 1380 54 5 1200 2 645 Air shipment See Figure 1 3 Frontal Positioner Air Shipment on page 9 Lateral Po...

Страница 17: ...on page 17 DL User parts 1040 41 860 33 9 680 26 8 100 220 On pallet X Ray tube housing 960 37 7 770 30 3 710 28 113 250 On pallet Chiller Coolix 4100 1200 47 2 555 21 8 610 24 120 264 5 On pallet Ca...

Страница 18: ...ixed point dual arm Shipment on page 19 Substructure for Dual Arm suspen sion 330 13 1040 41 490 19 3 70 154 3 On pallet see Fig ure 1 14 Ship ment of Substruc ture for Dual Arm suspension on page 20...

Страница 19: ...Detail of Innova Shipping Information Frontal Positioner Gantry on Shipping Dolly Figure 1 2 Frontal Positioner Gantry on Shipping Dolly General Requirements 8 InnovaTM IGS 6 5750182 1EN 3...

Страница 20: ...Frontal Positioner Air Shipment Figure 1 3 Frontal Positioner Air Shipment General Requirements 5750182 1EN 3 InnovaTM IGS 6 9...

Страница 21: ...Lateral Positioner on Shipping Dolly Longer and shorter dollies Figure 1 4 Lateral Positioner on longer type Dolly General Requirements 10 InnovaTM IGS 6 5750182 1EN 3...

Страница 22: ...e are for shipping When the Lateral Positioner and dolly are in rolling configuration for hospital access the dimensions are Height 2001 mm 78 8 in and width 1040 mm 41 in General Requirements 5750182...

Страница 23: ...Figure 1 5 Lateral Positioner on shorter type Dolly General Requirements 12 InnovaTM IGS 6 5750182 1EN 3...

Страница 24: ...Lateral Positioner Stationary Rails Packaging Figure 1 6 Lateral Positioner Stationary Rails Shipment General Requirements 5750182 1EN 3 InnovaTM IGS 6 13...

Страница 25: ...Omega Table Shipment Figure 1 7 Omega Table Shipment General Requirements 14 InnovaTM IGS 6 5750182 1EN 3...

Страница 26: ...8 C1 and C2 Cabinets in crate The shipping weight is of about 90 kg 198 5 lbs per cabinet NOTE Please use appropriate transportation and lifting means when handling the system cabinets Professional h...

Страница 27: ...Power Distribution Box PDB CE Figure 1 9 PDB CE Shipment General Requirements 16 InnovaTM IGS 6 5750182 1EN 3...

Страница 28: ...Power Distribution Box PDB UL Figure 1 10 PDB UL Shipment Large Display Monitor Option Figure 1 11 Large Display Monitor Shipment General Requirements 5750182 1EN 3 InnovaTM IGS 6 17...

Страница 29: ...Figure 1 12 Large Display Cabinet on pallet General Requirements 18 InnovaTM IGS 6 5750182 1EN 3...

Страница 30: ...suspension with fixed point dual arm MAVIG suspension with fixed point dual arm for Large Display Monitor Figure 1 13 MAVIG suspension with fixed point dual arm Shipment General Requirements 5750182 1...

Страница 31: ...up as needed on pallets Figure 1 15 Other Standard Shipping Box 1 3 2 Tools and Test Equipment Refer to Table 1 2 on page 21 To obtain a list of tools and test equipment for components not specified i...

Страница 32: ...tage Cable Installation Laptop Computer MS DOS Windows Positioner Configu ration and Calibra tion Lateral Positioner Ladders Installation Lateral Positioner Toolcase shipped with Lateral Posi tioner F...

Страница 33: ...vice Engineer s Tool Case DL User parts Monitor Suspension Ladders Installation For Suspension with rails XT Lifting Tool x2 46 156940G3 Installation For LDM Suspen sion with fixed point Dual Arm In s...

Страница 34: ...40 mm 96 in wide corridor Calculations need to be made for accommodation of equipment through narrower corridors Elevator Depth The minimum elevator depth needed to accommodate the Innova Gantry shipp...

Страница 35: ...ee Check Verify equipment can be transported via the route specified in Step One Sketch on page 23 Compare Route Survey compiled in Step Two Survey on page 24 to equipment specifications in this and o...

Страница 36: ...Compatibility on page 71 Atmospheric Pressure Refer to Table 1 2 Atmospheric Pressure Storage and transport on page 27 To obtain altitude and atmospheric pressure requirements for components not speci...

Страница 37: ...nt as well The lowest temperature e g 10 C 50 F and humidity is preferable If they are to be stored outside of their shipping box or in the inner shipping box without plastic wrapping they should be s...

Страница 38: ...um specified relative humidity capability 80 1MP MX191 LCD Monitor Maximum specified relative humidity capability 80 Table 1 2 Atmospheric Pressure Storage and transport SUB SYSTEM COMPONENTS ATMOSPHE...

Страница 39: ...itation is due to the capability of batteries included in UPS Table 1 3 Maximum shipment duration for Fluoro UPS Temperature Shipment max duration Weeks 55 C 131 F 2 50 C 122F 3 40 C 104 F 6 30 C 86 F...

Страница 40: ...oom This room contains user interface and control monitors No intentional or unintentional contact with the patient shall occur with the patient in this area Technical Room This room contains electron...

Страница 41: ...lateral gantries Figure 2 1 Frontal and Lateral Gantries The frontal and lateral gantries include Frontal Gantry 1 L arm 2 Pivot 3 C Arc 4 Motorized Elevator for the Detector 5 X Ray Tube 6 Collimator...

Страница 42: ...9 Carriage 10 Pivot 11 C Arc 12 Motorized Elevator for the Detector 13 X Ray Tube and Tube Elevator 7 X Ray Tube cover spacer 14 Collimator 15 21 cm or 31 cm Detector Innova Patient Table Figure 2 2...

Страница 43: ...rfaces Figure 2 3 User Interfaces Monitors By default Four 19 monitors are provided in the Exam Room FRT LIVE monitor FRT REVIEW monitor LAT LIVE monitor Equipment Requirements 32 InnovaTM IGS 6 57501...

Страница 44: ...E ABOVE COMPONENTS ARE NOT CERTIFIED FOR USE OUTSIDE THE TECHNICAL ROOM IT IS MANDATORY TO INSTALL THEM IN THIS AREA IT IS FORBIDDEN TO INSTALL THEM IN THE EXAM ROOM Options Large Display Monitor LDM...

Страница 45: ...the Exam Room or in the Control Room Table 2 5 Location of 19 monitors mandatory and optional Video Splitter Out put Frontal and Later al Output 1 Output 2 Output 3 Output 4 Live Exam Room Control Roo...

Страница 46: ...second LDM a wall mounting kit can be provided Third party monitor suspension In addition or replacement of the GE provided suspensions the customer can install the suspension of his choice third part...

Страница 47: ...STOMER RESPONSIBILITIES Advantage Windows workstation AW The AW workstation option is composed of a workstation 1 or 2 19 flat panel monitors in the Control Room One optional 19 flat panel monitor can...

Страница 48: ...Gantry and patient table sweep volume curves These systems include Frontal and Lateral Positioner Omega Table C2 Cabinet C1 Frontal Cabinet C1 Lateral Cabinet 1 kVA Cabinet UPS 3 kVA LDM UPS Chillers...

Страница 49: ...le Head Extender 1 Figure 2 13 Ta ble Head Ex tender dimen sions on page 49 Gas Box Outlets Omega Table 1 Figure 2 14 Gas box outlets Omega Table on page 50 Frontal and Lateral Positioner and Omega Pa...

Страница 50: ...page 55 For LDM Suspension with fixed point Dual Arm Large Display Mavig sus pension with fixed point dual arm Optional 1 Figure 2 20 Large display Mavig suspen sion with fixed point dual arm dimensi...

Страница 51: ...igure 2 28 3 kVA LDM UPS model 9130 di mensions on page 64 Fluoro UPS Cabinets Optional 1 UPS UL Figure 2 29 Flu oro UPS UL di mensions Op tional on page 65 1 UPS CE Figure 2 30 Flu oro UPS CE di mens...

Страница 52: ...Illustration DL Image Monitor 1 Figure 2 34 DL Image Monitor dimensions on page 69 VCIM 1 Figure 2 35 VCIM dimen sions on page 70 Figure 2 5 Frontal Positioner dimensions Side View Equipment Requireme...

Страница 53: ...Figure 2 6 Frontal Positioner dimensions Top View Figure 2 7 Frontal Positioner dimensions Front View Equipment Requirements 42 InnovaTM IGS 6 5750182 1EN 3...

Страница 54: ...Figure 2 8 Lateral Positioner dimensions Side View Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 43...

Страница 55: ...Figure 2 9 Lateral Positioner dimensions Top View Equipment Requirements 44 InnovaTM IGS 6 5750182 1EN 3...

Страница 56: ...Figure 2 10 Lateral Positioner dimensions Front View Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 45...

Страница 57: ...Figure 2 11 Omega V Table dimensions Equipment Requirements 46 InnovaTM IGS 6 5750182 1EN 3...

Страница 58: ...to account any table devices installed on the table end rail If there are any devices installed on the table foot end the width of these devices must be added to the existing 500 mm 19 7 in to maintai...

Страница 59: ...Figure 2 12 Omega Table side clearance CPR access Equipment Requirements 48 InnovaTM IGS 6 5750182 1EN 3...

Страница 60: ...Figure 2 13 Table Head Extender dimensions Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 49...

Страница 61: ...Figure 2 14 Gas box outlets Omega Table Equipment Requirements 50 InnovaTM IGS 6 5750182 1EN 3...

Страница 62: ...tance refer to Table 2 7 Patient Table Frontal Gantry isocenter distances on page 52 2 in the case of Lateral Gantry Off iso feature installed the Lateral Gantry will work in the range 200 mm 7 9 in a...

Страница 63: ...lative Positions Top View Table 2 7 Patient Table Frontal Gantry isocenter distances ANGIO CARDIO CARDIO NEURO Omega V non motorized 1278 mm 50 3 in 1395 mm 54 9 in Omega V motorized 1278 mm 50 3 in 1...

Страница 64: ...6 2 m 244 in from Lateral Gantry to ceiling exit point This includes sag between drape points A B C and D The worst case Lateral Gantry cable drape extension including sag is 1 85 m 72 8 in between A...

Страница 65: ...Figure 2 18 LCD 6 monitors suspension dimensions Optional Equipment Requirements 54 InnovaTM IGS 6 5750182 1EN 3...

Страница 66: ...Figure 2 19 Large Display suspension with rails dimensions Optional Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 55...

Страница 67: ...Figure 2 20 Large display Mavig suspension with fixed point dual arm dimensions Optional Equipment Requirements 56 InnovaTM IGS 6 5750182 1EN 3...

Страница 68: ...Figure 2 21 Ceiling Plate of Substructure for Dual Arm suspension dimensions Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 57...

Страница 69: ...Figure 2 22 C2 Cabinet dimensions Equipment Requirements 58 InnovaTM IGS 6 5750182 1EN 3...

Страница 70: ...Figure 2 23 C1 Frontal Cabinet dimensions Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 59...

Страница 71: ...Figure 2 24 C1 Lateral Cabinet dimensions Equipment Requirements 60 InnovaTM IGS 6 5750182 1EN 3...

Страница 72: ...gure 2 25 X Ray Tube Chiller dimensions NOTE Required floor space depends on ambient room temperatures When in doubt allow for maximum floor space Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 6...

Страница 73: ...Figure 2 26 Detector Conditioner dimensions Equipment Requirements 62 InnovaTM IGS 6 5750182 1EN 3...

Страница 74: ...Figure 2 27 1 kVA Cabinet UPS model 9130 dimensions Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 63...

Страница 75: ...Figure 2 28 3 kVA LDM UPS model 9130 dimensions Equipment Requirements 64 InnovaTM IGS 6 5750182 1EN 3...

Страница 76: ...In front of the cabinet the clear width of the service area to insure electrical safety shall be at least 0 9 m In cases where 2 cabinets are installed face to face both sides of the access way the c...

Страница 77: ...the clear width of the service area to insure electrical safety shall be at least 0 9 m In cases where 2 cabinets are installed face to face both sides of the access way the clear width shall be at l...

Страница 78: ...Figure 2 31 ECG Acquisition Device Modules dimensions Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 67...

Страница 79: ...Figure 2 32 Large Display Cabinet dimensions Optional Equipment Requirements 68 InnovaTM IGS 6 5750182 1EN 3...

Страница 80: ...Figure 2 33 DL Keypad dimensions Figure 2 34 DL Image Monitor dimensions Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 69...

Страница 81: ...NUM BER PRECABLED LCD 6 MONITOR SUSPENSION CABLE HARNESS 24 m or CABLE HARNESS 36 m 5520086 5420085 or 5420087 2393190 1 1EN THIRD PARTY MONITOR SUSPENSION CABLE HARNESS 24M or CABLE HARNESS 36M or L...

Страница 82: ...ture DBF01O0X where X may be 1 or higher System Compatibilities Cross Reference 19 Monitors PRODUCT NAME MODEL NUMBER PRE INSTALLATION DOCUMENT NUMBER CATALOG NUMBER LCD 19 SMD19100G B W with Stand 51...

Страница 83: ...INET COOLIX 4100 CHILLER DETECTOR CONDITIONER AND FLUORO UPS WHEN INSTALLED INCLUDE FANS THAT ARE CREATING AIR CIRCULATION OF PULSED AIR WHEN THIS PULSED AIR IS IN AN ENVIRONMENT THAT MAY CONTAIN AIRB...

Страница 84: ...components see Illustration below 1 Lateral Gantry stationary rails 2 Cable drape rail 3 Lateral Gantry Lateral Gantry 4 LC Frontal Gantry 5 Monitor suspension 6 Counter balanced eye or thyroid shiel...

Страница 85: ...Figure 2 36 For Suspension with rails Patient Room Layout for Innova System Equipment Requirements 74 InnovaTM IGS 6 5750182 1EN 3...

Страница 86: ...DESCRIPTION DIMENSIONS LxWxH mm WEIGHT kg 1 LC GANTRY 1552x1070x2234 750 2 LP GANTRY 4135x2724x2112 735 797 3 OMEGA V LONG PATIENT TABLE 3336x727x780 590 4 MAVIG LDM SUSPENSION 248 5 XRAY BUZZER 1 6 M...

Страница 87: ...Figure 2 37 For LDM Suspension with fixed point Dual Arm Top view of MAVIG suspension with fixed point with dual arm Equipment Requirements 76 InnovaTM IGS 6 5750182 1EN 3...

Страница 88: ...each the position required by medical staff Parking position Ceiling constraints other component and air flow Cable output and ceiling trap 2 2 2 2 Technical Room Layout For the service access and ven...

Страница 89: ...onfigurations The hardware delivered with the ECG acquisition kit will need to be installed in the Control Room and in Exam Room depending on the type of ECG Device used on the site Equipment Requirem...

Страница 90: ...stem Installation Configuration 1 For ECG devices installed in Control Room such as GE ECG like MacLab CardioLab or ComboLab Both the Physio Hubican modules are installed in the Control Room as shown...

Страница 91: ...head side and any object in the room e g wall device be superior to 500 mm 19 68 in 650 mm 25 5 in if Head Extender is used Provide sufficient space around the patient table for the unimpeded conduct...

Страница 92: ...cy Stop It is recommended to install in an accessible location an additional EPO button that allows the instantaneous switching off of all power from the System EXCEPT THE INPUT CABLE OF THE CABINET U...

Страница 93: ...oth sides of the access way the clear width shall be at least 1 2 m Figure 2 41 NOTE The order of the cabinets above is C1 frontal C1 lateral and C2 cabinets This is just an example cabinets can follo...

Страница 94: ...Distance between Frontal Gantry foot and C1 or C2 entry Relative distance 19 5 m 64 ft Tech and Exam room on same floor 22 m 72 ft for HV cables Technical to Exam room Distance between Frontal Gantry...

Страница 95: ...The Tube Chiller shall be no more than 5 m 16 feet above or 8 m 26 feet be low the upper position of the X Ray Tube see Figure 2 42 Dis tance between Tube Chiller and X Ray Tube on page 85 Technical r...

Страница 96: ...m minimum rail length past iso centre to wards foot end Length 1 2 3 ft 11 in In any case Lateral Gantry parking is only possible at patient head Figure 2 42 Distance between Tube Chiller and X Ray Tu...

Страница 97: ...r to design and approve the mounting method and provide GE Healthcare with an engineering report The floor level cannot exceed a general levelness of 5 mm 0 2 in for any 2 meters 79 in NOTICE The floo...

Страница 98: ...distance 79 4 mm 3 12 in Make sure to obtain data on compression strength of the concrete before using floor anchors Pan Type Floor Construction Requirement For Pan type floor construction steel chann...

Страница 99: ...concrete floor In the examination room the Innova Frontal Positioner is not placed on a computer floor but directly put on concrete floor the location of the cable access needs to be carefully planne...

Страница 100: ...Figure 2 47 Hole location in concrete floor Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 89...

Страница 101: ...of the outcoming conduit plus bushing is limited to 12 mm 1 2 in NOTE Refer to table Chemical anchors Pull out efforts and recommendations in 2 3 2 Mounting Requirements on page 92 for pull out effort...

Страница 102: ...tion on kit 2286398 S18101SK refer to Innova Frontal Positioner and Omega Tilt Table Floor Preparation Kits GE Healthcare supplied in 2 3 2 Mounting Requirements on page 92 Figure 2 50 Cable Curvature...

Страница 103: ...ateral Positioner and patient table 2 3 2 Mounting Requirements Floor Loading and Recommended Mounting Methods See Table 2 14 on page 93 To obtain floor loading and recommended mounting methods for co...

Страница 104: ...See Figure 2 52 Innova Frontal Positioner Floor Mounting Methods 1 2 on page 97 Figure 2 53 Inno va Frontal Posi tioner Floor Mounting Methods 2 2 on page 98 and Figure 2 55 Cable Conduit For On Grad...

Страница 105: ...2 50 64 Not applicable Detector Con ditioner 14 6 32 See Illustration Thermo Con Detector Conditioner and Mounting brackets Dimen sions in 2 1 3 Dimension Drawings on page 37 Not applicable Not applic...

Страница 106: ...View of the MAVIG suspension with fixed point dual arm for Large Display Optional in 2 1 3 Dimension Drawings on page 37 Not applicable Not applica ble Not applicable Substructure for Dual Arm suspens...

Страница 107: ...e Conduit For On Grade Floor Anchor Kit Figure 2 55 Cable Conduit For On Grade Floor Anchor Kit on page 100 Inner Base Plate For Above Grade Floor Anchor Kit Figure 2 54 Inner Base Plate For Above Gra...

Страница 108: ...Figure 2 52 Innova Frontal Positioner Floor Mounting Methods 1 2 Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 97...

Страница 109: ...Figure 2 53 Innova Frontal Positioner Floor Mounting Methods 2 2 Equipment Requirements 98 InnovaTM IGS 6 5750182 1EN 3...

Страница 110: ...Figure 2 54 Inner Base Plate For Above Grade Floor Anchor Kit Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 99...

Страница 111: ...Figure 2 55 Cable Conduit For On Grade Floor Anchor Kit Equipment Requirements 100 InnovaTM IGS 6 5750182 1EN 3...

Страница 112: ...thods Bolts M20 Mechanical anchors or Chemical anchors the number of holes used mandatory is Gantry baseplate 12 max and 8 min holes used are acceptable Table baseplate 10 max and 8 min holes used are...

Страница 113: ...daN per bolt with 4 bolts Number of holes in the plate 12 max 8 min man datory 10 max 8 min man datory 24 max 12 min man datory 4 mandatory Recommended chemical anchors example 1 Supplier HILTIHVU adh...

Страница 114: ...Figure 2 57 Gantry and table mounting holes Equipment Requirements 5750182 1EN 3 InnovaTM IGS 6 103...

Страница 115: ...injector Never install injector and radiation protection on the same table accessory rail Typical installation on the front table accessory rail is Smart handle or Smart box Table Side System Control...

Страница 116: ...h ECG Device in Exam Room 1 Check the environment of the ECG Device module located in Exam Room provides enough space to install the physio module at a max distance of 1 meter 2 Check enough space can...

Страница 117: ...ocation of Stationary Rails on Ceiling Absolute min configuration on page 108 Potential Wall Interferences Also the lips on the rails must face toward isocenter NOTE Do not attempt to install the Gant...

Страница 118: ...nfiguration Figure 2 58 Location of Stationary Rails on Ceiling Delivered Recommended max configuration on page 107 Some room configurations may require shorter configurations Figure 2 59 Location of...

Страница 119: ...Figure 2 59 Location of Stationary Rails on Ceiling Absolute min configuration Equipment Requirements 108 InnovaTM IGS 6 5750182 1EN 3...

Страница 120: ...y Rail Mounting Specifications Monitor Suspension Rails Aluminum rails support the In room Monitor Bridge used in systems with 21 and 31 cm detector X Ray rooms Equipment Requirements 5750182 1EN 3 In...

Страница 121: ...l members and mounting the stationary rails to this channel can greatly reduce the number of vertical members The stationary rail support structure must be leveled before installation can begin Do not...

Страница 122: ...e solid ceiling in case of a Large Display Monitor and the MAVIG suspension with fixed point dual arm If customer requires GEHC to mount the Substructure for Dual Arm suspension the customer must hire...

Страница 123: ...of the Large Display Monitor The Substructure for Dual Arm suspension is mandatory to install the MAVIG suspension with fixed point dual arm for Non seismic Zones For Seismic Zone installations refer...

Страница 124: ...nd the lower edge of the false ceiling Length calculation and adaptation instruction are provided in the MAVIG substructure assembly instructions DBF01O0X where X may be 1 or higher The Substructure f...

Страница 125: ...specifications The false ceiling should include an opening around the interface plate to allow service engineers to install and replace the suspension and the Large Display Monitor The diameter of the...

Страница 126: ...nstallation Manual in OEM manuals list An hooking point shall be provided in order to uplift the LD additional monitor at the swingout arm level during its installation Hooking point characteristic It...

Страница 127: ...site with its proper seismic kit Monitor Flat Panel Seismic Kit 2353317 VCIM seismic kit 2365510 Walls Anti seismic means be installed before opening the system for normal use The C1 Cabinets the C2 C...

Страница 128: ...ith fixed point dual arm CAUTION THE STANDARD SUBSTRUCTURE MAVIG GD60D022 SHOULD NOT BE USED WITH SYSTEM IN SEISMIC ZONE Contact MAVIG or local contractor to design and supply specific substructure in...

Страница 129: ...Figure 2 1 Center of gravity and seismic support and attachments Equipment Requirements 118 InnovaTM IGS 6 5750182 1EN 3...

Страница 130: ...vironment and in a SPECIAL ENVIRONMENT for systems OR configurations vicinity of active HF SURGICAL EQUIPMENT refer to Installations Requirements amp Environment Control The Innova system is suitable...

Страница 131: ...ua tions flicker emis sions IEC 61000 3 3 Not applicable The system is suitable for use in all establishments other than domes tic and those directly connected to the public low voltage power sup ply...

Страница 132: ...ines s 2 kV line s to earth 1 kV line s to lines s 2 kV line s to earth 1 kV line s to lines s 2 kV line s to earth Mains power quality is that of a typical com mercial or hospital environment Voltage...

Страница 133: ...ommended separation distance calcu lated from the equation applicable to the frequency of the transmitter Recommended separation distance d 3 5 V1 P d 3 5 E1 P from 80 MHz to 800 MHz d 7 E1 P from 800...

Страница 134: ...150 kHz to 80 MHz field strengths are less than 3 V m 4 Refer to table warning below WARNING THE INNOVA IGS SYSTEM IS A LARGE PERMANENTLY INSTALLED MEDICAL EQUIPMENT FOR WHICH THE SIMULATED OPERATION...

Страница 135: ...ulse modulation 50 duty cycle 18Hz 930 28 Pulse modulation 50 duty cycle 18Hz 1720 28 Pulse modulation 50 duty cycle 217Hz 1845 28 Pulse modulation 50 duty cycle 217Hz 1970 28 Pulse modulation 50 duty...

Страница 136: ...at a power not listed above the DISTANCE can be estimated using the equation in the corresponding column where P is the power rating of the transmitter in watts W according to the transmitter manufac...

Страница 137: ...EM Other electrical equipment may disturb and interfere with these Innova components The control of the clearing distances from the noise sources is recommended power supplies converters from nearby m...

Страница 138: ...me AC power distribution panel should be supplied by a separated AC power line coming from a separated transformer line and winding Stacked components equipment The Innova system should not be used ad...

Страница 139: ...Page intentionally left blank Special Construction Requirements 128 InnovaTM IGS 6 5750182 1EN 3...

Страница 140: ...installed on higher level second floor or above the temperature and humidity of the rooms that are directly below the gantry room should be maintained same as the exam room requirement Failure to do s...

Страница 141: ...ndensation occurs and water drops from outlets and pipes of the air conditioner in the technical room Therefore it is critical to install the cabinets where there is no risk of flood from the air cond...

Страница 142: ...6 546 0 16 546 3 B W flat monitors 0 25 859 0 25 859 0 25 859 0 25 859 Ctrl Room Total 0 41 1405 0 41 1405 0 41 1405 0 41 1405 Tech Room C1 Frontal Cabinet 0 71 2421 0 99 3389 1 29 4412 1 59 5435 C1 L...

Страница 143: ...aximum Use Exam Room 7 in room B W TFT monitors 0 59 2005 Same values as Stand by Same values as Stand by Same values as Stand by In room AW TFT monitor 0 12 409 Typical injector 0 09 320 LD Monitor 0...

Страница 144: ...by its ventilation Cooling air enters the cabinets through the air inlet grids located at the bottom and exhausted through the outlet on the roof A suitable ventilation or cooling system must be insta...

Страница 145: ...dB A at 1 meter for C2 Cabinet Frontal Lateral Limited to 60 dB A at 1 meter for the Coolix 4100 chiller Limited to 65 dB A at 1 meter for C1 Frontal Cabinet Limited to 65 dB A at 1 meter for C1 Later...

Страница 146: ...o FRT 1 79 7 59 2 LAT 2 79 5 59 1 FRT and LAT 2 79 8 60 2 NOTE Noise generated by system cabinets all together is 70dB If cabinets are installed too close to the exam room e g behind sliding doors app...

Страница 147: ...Page intentionally left blank Environmental Requirements 136 InnovaTM IGS 6 5750182 1EN 3...

Страница 148: ...a system 150A 480V 3 Phases for UL 80A 380V 400V 415V 3 Phases for CE Table 5 3 Options Option Nominal voltage Frequency Nominal Power consumption Type of power input LDM 100 120 V 220 240 V 50 Hz or...

Страница 149: ...UIREMENTS LEAKAGE CURRENT AND GROUNDING NOTICE When a Fluoro UPS is or will be installed a Neutral line is mandatory If IT scheme as earthing system is used an isolation transformer is required with D...

Страница 150: ...hases L1 and L3 Figure 5 2 Power configuration for Coolix 4100 Chillers A non continuity measurement must be made between phase L2 of the frontal autotransformer and phase L3 of the lateral autotransf...

Страница 151: ...cabinet for LD system option The LDM optional system must be powered through a wall circuit breaker or equivalent device with LOTO capability This circuit breaker must have a 30 amps current rating Pr...

Страница 152: ...E Large Display Cabinet can provide power to an optional secondary large monitor outside of the patient vicinity Figure 5 3 Power distribution CE Electrical Requirements 5750182 1EN 3 InnovaTM IGS 6 1...

Страница 153: ...78ft 8in L out load 5 x 10 mm 3ph N PE AWG3 AWG6 3ph N PE 24 m 78ft 8in 1 Size and type may be adapted locally per local regulation NOTE Electrical contractor is responsible for providing the power c...

Страница 154: ...elts with spreader bars Check for sufficient floor and elevator loading capacity Check the integrity of the UPS equipment carefully If you notice visible damage do not install or start the UPS Contact...

Страница 155: ...ntial shall be set to 300 mA Switching OFF the unit does not isolate the UPS from the utility Do not install the UPS in an excessively humid environment or near water Avoid spilling liquids on or drop...

Страница 156: ...ifications in 5 1 1 Electrical Requirements on page 137 Contact your local GE Healthcare representative for more information and or public power distribution analysis System failure In the event of a...

Страница 157: ...Power Distribution Box CE Figure 5 5 PDB CE 50 Hz Electrical Requirements 146 InnovaTM IGS 6 5750182 1EN 3...

Страница 158: ...Figure 5 6 PDB Schematic CE 1 2 Electrical Requirements 5750182 1EN 3 InnovaTM IGS 6 147...

Страница 159: ...Figure 5 7 PDB Schematic CE 2 2 Electrical Requirements 148 InnovaTM IGS 6 5750182 1EN 3...

Страница 160: ...Power Distribution Box UL Figure 5 8 PDB UL 60 Hz US only Electrical Requirements 5750182 1EN 3 InnovaTM IGS 6 149...

Страница 161: ...Figure 5 9 PDB Schematic UL 1 2 Electrical Requirements 150 InnovaTM IGS 6 5750182 1EN 3...

Страница 162: ...Grounding A vascular lab is a critical care area and requires a special grounding system for patient safety An equipotential grounding system is recommended for meeting patient safety requirements Ele...

Страница 163: ...fer to Grounding Continuity Job card in the Installation manual NOTICE All shielded cables shall have a connection to ground at each extremity without regard to the grounding to the scheme below NOTIC...

Страница 164: ...Figure 5 11 Grounding distribution Table 5 4 CABLE FROM TO WIRE GAUGE hospital AW Power Strip Ground hospital PDB C1 Frontal Cabinet 35 mm AWG1 Electrical Requirements 5750182 1EN 3 InnovaTM IGS 6 153...

Страница 165: ...ns such as the NEC For countries which are not covered by local requirement like NEC the ground wire to earth should be at minimum of AWG 2 0 150 A breaker UL or 35mm2 80 A breaker CE or same size 100...

Страница 166: ...m 30 ft 2 0 2 0 2 0 WARNING RECOMMENDED FEEDER CABLE GAUGE FOR PHASES NEUTRAL GROUND PDB INPUT TERMINALS ACCEPT 2 0 AND 3 0 AWG BIGGER CABLES NEEDS A SIZE RE DUCTION BEFORE PDB ENTRY 20 m 70 ft 2 0 2...

Страница 167: ...InnovaTM IGS 620 InnovaTM IGS 630 MIS Charts General Guidelines Innova System introduces a new system interconnect with a star distribution for all cables from the technical area Cable group 1 for Exa...

Страница 168: ...and signal wires These wires must be kept separated from each other for proper system operation Electrical ducts have advantages when used with a single room or two adjacent rooms Electrical ducts co...

Страница 169: ...to cover the duct hole in the patient room if there is no gases box Floor mount installation can be accomplished one of two ways Connectors mounted in trough under mounting bracket Figure 1 Connectors...

Страница 170: ...nd outlets NOTE 18 meters 59 ft is the only cable length available for the Remote TSUI box data cable connecting remote TSUIs in the Control Room and the patient Table Electrical Requirements 5750182...

Страница 171: ...for cabling In case 24 m required they have to be added in the order and replaced on site For a description of how to use the following 5 cable group schematics see below Figure 5 14 Description of c...

Страница 172: ...Figure 5 15 CABLE GROUP 1 FROM TECHNICAL AREA TO EXAM AREA Electrical Requirements 5750182 1EN 3 InnovaTM IGS 6 161...

Страница 173: ...Figure 5 16 CABLE GROUP 2 FROM TECHNICAL AREA TO CONTROL AREA Electrical Requirements 162 InnovaTM IGS 6 5750182 1EN 3...

Страница 174: ...Figure 5 17 Cable Group Fast Link Option Electrical Requirements 5750182 1EN 3 InnovaTM IGS 6 163...

Страница 175: ...Figure 5 18 CABLE GROUP 3 FROM TECHNICAL AREA TO TECHNICAL AREA Electrical Requirements 164 InnovaTM IGS 6 5750182 1EN 3...

Страница 176: ...Figure 5 19 CABLE GROUP 4 FROM TECHNICAL AREA TO EXAM AREA Electrical Requirements 5750182 1EN 3 InnovaTM IGS 6 165...

Страница 177: ...Figure 5 20 CABLE GROUP 5 FROM TECHNICAL AREA TO EXAM AREA Electrical Requirements 166 InnovaTM IGS 6 5750182 1EN 3...

Страница 178: ...418 27660A 2258294 27661A 2258294 27662A 5191563 30 7 AMP 8 pin RJ45 27663A 5192546 2789 600 13 8 DB 11 pin 34 4 27664A 5439433 27665A 5191864 27666A 2352342 WATER HOSE 27667A 2352342 WATER HOSE 27669...

Страница 179: ...5 5 RJ45 14 1 28772A 5182111 28776A 5197765 28803A 5474237 28804A 5474237 29010A 5305995 29011A 5305995 29012A 5305995 29013A 5305997 29022A 5305995 29023A 5305995 29024A 5305995 1 29028A 5305995 2902...

Страница 180: ...28782A 5191661 OPTICAL FIBER 28783A 5182870 28784A 5191074 28786A 5182230 28787A 5193468 28788A 5191568 OPTICAL FIBER 28789A 5265923 28790A 5191563 28792A 5191563 28795A 5182714 28799A 5182561 28800A...

Страница 181: ...am Room 28576A 5165029 28577A 5165029 28578A 5182230 28579A 5191279 28580A 5192546 28581A 2261135 28582A 2261135 28583A 5191568 28584A 5439433 28585A 5191864 28588A 5181625 28806A 5182230 29173A 54835...

Страница 182: ...5427519 29163A 5431888 Dispatch Cable 27694 5487798 28641 5341048 29176 5487504 Cable select live add Monitor GP4 6 29229A 5215437 Cable select Roadmap add Monitor GP4 7 29230A 5215437 Innova Diament...

Страница 183: ...detector provides 24 VAC for driving X Ray ON line Hospital or contractor to provide 1 5 mm2 AWG 14 wires to connect to the system X Ray ON lamp is active during X Ray exposures WARNING THE X RAY ON...

Страница 184: ...5 6 Ready For X Ray Lamp Innova systems with 21 31 cm detector provides contacts for driving a Ready for X Ray lamp These contacts are terminals 5 and 6 of TB2 bulkhead connector of the C2 cabinet El...

Страница 185: ...60601 2 43 requires not to install door interlocks It is the responsibility of the field service to check that this requirement is not in contradiction with local regulation In case of conflict follo...

Страница 186: ...uence same level information as provided by the control room control panel The speaker must be installed in the exam room out of the patient vicinity to give easy access to the FE for maintenance oper...

Страница 187: ...Electrical Ducts in 5 3 2 Cable Channeling on page 156 For MAC LAB System EX refer to Marquette document P N 2000465 001 Preinstallation Guide 5 10 Advantage Windows A power cord is supplied with Adv...

Страница 188: ...the injector In all cases 110 VAC or 230 VAC it will be connected to a wall outlet near the operator location fed by the main disconnect room device 5 12 Lighting Specifications 5 12 1 Room Light Dis...

Страница 189: ...electrical components e g control panel for the electrical industry Lighting Relay Innova systems with 21 31 cm detector has the ability to control an external relay that applies power to the room lig...

Страница 190: ...manually cut Zone 4 Normal lighting manually cut For maintenance NOTICE Zone 5 Nothing is permitted in this zone that means no mounting hardware can protrude below the finished ceiling height top sur...

Страница 191: ...NOTE In Germany Ambient luminance of 100 lux maximum is required to maintain Exam Room class 2 according to DIN 6868 157 Electrical Requirements 180 InnovaTM IGS 6 5750182 1EN 3...

Страница 192: ...system installation begins Once submitted a member of the GEHC Broadband Solutions team will contact the site IT to set up the VPN connection The SupportCentral links where information from the InSit...

Страница 193: ...r to the detailed Checklist provided in the document IGS System Installation Prerequisites DOC2024755 available from MyWorkshop Always use the last revision which will contain all mandatory updates Fo...

Страница 194: ...InnovaTM IGS 6...

Отзывы: