Page 157
Hydran* M2-X Instruction Manual
MA-029
Rev. 1.0,
30-Jul-18
1. Run the cable through a conduit
[ ]
2. Verify all wires are identified at both ends
[ ]
3. Connect the wires to the corresponding I/O terminal block
[ ]
4. Connect the other end of the cable to the SCADA system
[ ]
1. Run the cable through a conduit
[ ]
2. Remove the plastic cover from the ac power supply terminal block
[ ]
3. Connect the wires to the ac power supply terminal block
[ ]
4. Connect the other end of the cable to the power source
[ ]
Verifying the Hydran M2-X Operation
1. Fasten the cover with the four screws
[ ]
2. Verify all cable entry points to ensure they are watertight
[ ]
3. Verify the heating plate is warm
[ ]
1. Set
Current Date
[ ]
2. Set
Current Time
[ ]
Setting the Parameters of the History Files
1. Set
Short Term Rate
to _________ minutes
[ ]
2. Set
Long Term #1
to _________
[ ]
3. Set
Long Term #2
to _________
[ ]
4. Set
Long Term #3
to _________
[ ]
5. Set
Long Term #4
to _________
[ ]
6. Erase the content of Short Term history file
[ ]
7. Erase the content of Long Term history file
[ ]
1. Wait 30 minutes or until levels are stable
[ ]