GE H
EALTHCARE
D
IRECTION
5394141, R
EVISION
5
LOGIQ™ P5 S
EVICE
M
ANUAL
Section 8-7 - Mechanical Option Installation instruction
8-199
8-7-12
Printer VCR DVD fixture Top installation - CP900 Printer
1.) Unscrew 2 existing screws from the top cover.
2.) Install Fixture VCR bot bracket on the top cover by screwing 2 screws(2306565, BH M4x16 WHT).
3.) Install color printer to the VCR top bracket by screwing 4 screws(5161586, M3x8 WHT).
Figure 8-291 Printer VCR DVD Fixture Top installation
Figure 8-292 Printer VCR DVD Fixture Top installation
Figure 8-293 Printer VCR DVD Fixture Top installation
Содержание H44662LD
Страница 2: ......
Страница 9: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL i 9 JA ZH CN KO ...
Страница 28: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SERVICE MANUAL i 28 ...
Страница 531: ......