4 Operation
4.1 Packing the column
20
FineLINE 35
oligo
column
Operating Instructions
28-9649-57
AA
4.1 Packing the column
For optimum performance from FineLINE 35
oligo
column and Primer Support, the
packing and unpacking procedures outlined below are recommended.
Please read the complete chapter before using the column!
FineLINE 35
oligo
column is intended for use with ÄKTA™ oligopilot™ 100 and the
instructions in this section assumes that this is the case.
Table 4-1.
Items required for packing
Note:
Primer Support 200 should be packed as a slurry.
Item
Quantity
FineLINE 35
oligo
column
1
Operating Instructions
1
Allen key 4 mm
1
Union 5/16" female/M6 male
2
Tubing Connectors OD 1/8” tubing
12
Ferrules for OD 1/8” tubing
12
Stop plug 5/16”
1
Tubing ID 1.6 mm OD 1/8”, 30 cm
2
Tubing ID 1.6 mm OD 1/8”, 40 cm
3
100 or 250 ml bottle for support slurry
1
Funnel
1
Beaker 500 ml
1
Содержание FineLINE 35 oligo
Страница 1: ...GE Healthcare Operating Instructions Original instructions FineLINE 35 oligo column ...
Страница 2: ......
Страница 4: ...Table of Contents 4 FineLINE 35 oligo column Operating Instructions 28 9649 57 AA ...
Страница 18: ...3 Installation 18 FineLINE 35 oligo column Operating Instructions 28 9649 57 AA ...
Страница 34: ...6 Troubleshooting 34 FineLINE 35 oligo column Operating Instructions 28 9649 57 AA ...
Страница 43: ......