Part II – Replacing the CPU
53
12
•
The option string will be written to the CPUs, after which they will automatically reboot. After
the reboot is complete, the dialog box for
Step 7
will display to update the settings to the
new unit. The option to skip the task is available if this has already been done.
Figure 12-14
Step 7 – Copy Setting dialog box
•
Finally, the dialog box for
Step 8
will display. Commissioning the new CPU will activate all of
the relaying and protection algorithms in the unit. Click the
Finish
button to complete the
process.
Figure 12-15
Step 8 – Set CPU Commission dialog box
Содержание Entellisys DEH-230
Страница 1: ...GE Entellisys Low Voltage Switchgear System Administrator Manual ...
Страница 4: ......
Страница 8: ...System administrator roles and responsibilities 8 1 ...
Страница 10: ...Pre programming settings prior to switchgear arrival 10 2 2 ...
Страница 12: ...Commissioning the switchgear 12 3 ...
Страница 20: ...Time synchronization 20 5 ...
Страница 28: ...Installing and configuring remote HMI software 28 7 ...
Страница 32: ...Settings files and offline system configuration 32 8 Figure 8 3 Settings file compare screen ...
Страница 40: ...System archives 40 10 ...
Страница 44: ...Feature options 44 11 ...
Страница 54: ...Preparing and configuring a replacement CPU 54 12 ...
Страница 60: ...Other maintenance functions 60 13 ...
Страница 62: ......