![GE Druck ADTS 405 Скачать руководство пользователя страница 46](http://html.mh-extra.com/html/ge/druck-adts-405/druck-adts-405_user-manual_128377046.webp)
K114 Issue No. 9
3 - 12
Operation
3.8 Leak Testing the ADTS 405
It is important to check that the ADTS 405 and the connecting equipment does not
leak. Before use a leak check should be carried out as follows:
Connect the pitot and static hoses (to front panel of ADTS 405F). Temporarily seal the
free ends of the hoses.
Set the display to dual display, see 3.9.
Set the units to feet and knots, see 3.13.
Using the
SETUP
menu, choose the limits set for the aircraft or UUT, see 3.14.
Press SETUP, [LIMITS], and [NEXT] repeatedly to select the limit set from those
available.
Press [SEL] to save and then press
CLEAR/QUIT
repeatedly until the main
pressure screen shown below is displayed.
Note:
The numeric value of the parameters displayed change with each power-up
sequence. The amount of change depends on local atmospheric pressure
conditions at the time of power-up.
F
IGURE
3-2 M
AIN
P
RESSURE
D
ISPLAY
(L
EAK
M
EASURE
M
ODE
)
Press the
LEAK MEASURE/CONTROL
key to turn on the pressure controllers.
Содержание Druck ADTS 405
Страница 2: ... General Electric Company All rights reserved ...
Страница 4: ...K114 Issue No 9 ...
Страница 32: ...K114 Issue No 9 2 10 Druck ADTS 405 User Manual F IGURE 2 4 ADTS 405 G ENERAL VIEW ...
Страница 33: ...K114 Issue No 9 Installation 2 11 2 F IGURE 2 5 ADTS 405 R EAR P ANEL VIEW ...
Страница 41: ...K114 Issue No 9 Druck ADTS 405 User Manual 3 7 3 Control Mode ...
Страница 43: ...K114 Issue No 9 Druck ADTS 405 User Manual 3 9 3 Go to Ground ...
Страница 50: ...K114 Issue No 9 3 16 Operation FIGURE 3 6 TRIPLE DISPLAY FIGURE 3 5 DUAL DISPLAY ...
Страница 72: ...K114 Issue No 9 4 6 Maintenance INTENTIONALLY LEFT BLANK ...
Страница 92: ...K114 Issue No 9 5 20 Testing and Fault Finding INTENTIONALLY LEFT BLANK ...