x
K114 Issue No. 9
Power-down: To perform operations necessary to safely switch off a system after use.
Readjust:
To adjust again; to move back to a specified condition; to bring back to an
in-tolerance condition.
Reconnect:
To rejoin or refasten that which has been separated.
Refit:
Fit an item which has previously been removed.
Remove:
To perform operations necessary to take an equipment unit out of the next larger
assembly or system. To take off or eliminate. To take or move away.
Repair:
To restore damaged, worn out or malfunctioning equipment to a serviceable,
usable or operable condition.
Replace:
Remove an item and fit a new or a serviced item.
Reset:
To put back into a required position, adjustment or condition.
Service:
To perform such operations as cleaning, lubricating and replenishing to prepare for
use.
Test:
Ascertain by using the appropriate test equipment that a component or system
functions correctly.
Druck ADTS 405 User Manual
Содержание Druck ADTS 405
Страница 2: ... General Electric Company All rights reserved ...
Страница 4: ...K114 Issue No 9 ...
Страница 32: ...K114 Issue No 9 2 10 Druck ADTS 405 User Manual F IGURE 2 4 ADTS 405 G ENERAL VIEW ...
Страница 33: ...K114 Issue No 9 Installation 2 11 2 F IGURE 2 5 ADTS 405 R EAR P ANEL VIEW ...
Страница 41: ...K114 Issue No 9 Druck ADTS 405 User Manual 3 7 3 Control Mode ...
Страница 43: ...K114 Issue No 9 Druck ADTS 405 User Manual 3 9 3 Go to Ground ...
Страница 50: ...K114 Issue No 9 3 16 Operation FIGURE 3 6 TRIPLE DISPLAY FIGURE 3 5 DUAL DISPLAY ...
Страница 72: ...K114 Issue No 9 4 6 Maintenance INTENTIONALLY LEFT BLANK ...
Страница 92: ...K114 Issue No 9 5 20 Testing and Fault Finding INTENTIONALLY LEFT BLANK ...