Operation
3-1
March 2008
Introduction
See Chapter 1,
Installation
, and Chapter 2,
Initial Setup
, to prepare
the system for operation. When the meter is ready to take
measurements, proceed with this chapter. The following specific
topics are discussed:
•
Powering Up
•
Using the Display
•
Taking Measurements
Note:
All inputs and outputs of the Model GS868 are calibrated at
the factory, prior to shipment. If it becomes necessary to
recalibrate any of the inputs and/or outputs, see Chapter 1,
Calibration
, of the
Service Manual
.
!WARNING!
To ensure the safe operation of the Model GS868, it must be
installed and operated as described in this manual. In
addition, be sure to follow all applicable local safety codes
and regulations for the installation of electrical equipment.
Содержание DigitalFlow GS868
Страница 6: ...Chapter 1...
Страница 28: ...Chapter 2...
Страница 40: ...Chapter 3...
Страница 41: ...Operation Introduction 3 1 Powering Up 3 2 Using the Display 3 3 Taking Measurements 3 5...
Страница 49: ...Chapter 4...
Страница 50: ...Specifications General 4 1 Electrical 4 2 Operational 4 4 Transducer 4 4 Flowcell 4 5...
Страница 56: ...Appendix A...
Страница 57: ...CE Mark Compliance Introduction A 1 Wiring A 1 External Grounding A 1...
Страница 59: ...Appendix B...
Страница 60: ...Data Records Option Cards Installed B 1 Initial Setup Data B 2...
Страница 64: ...Appendix C...
Страница 65: ...Optional Enclosures Introduction C 1 Rack Mount Enclosure C 1 Rack Mount Wiring C 1 Rack Mount Front Panel C 2...
Страница 71: ...Appendix D...
Страница 72: ...Measuring P and L Dimensions Introduction D 1 Measuring P and L D 1...