March 2008
3-4
Logging Data
Log Type
9.
Press
[F1]
to create a non-circular log or press
[F2]
to create a
circular log.
A non-circular log automatically stops when the meter runs out of
memory or the specified
END TIME
is reached. A circular log runs
continuously until manually stopped, but only the data from the most
recent log cycle is saved. At the start of each cycle, the oldest
recorded data is overwritten by the new data from the current cycle.
Caution!
If data from one circular log cycle exceeds the meter’s
memory capacity, the earliest logged data will be lost.
STARTTIME Prompt
10.
Press
[F1]
to accept the displayed
Start Time
or press
[F2]
to enter a
different start time. To start logging immediately, press
[F3]
.
•
If
OK
was selected, proceed to step 11.
•
If
NOW
was selected, proceed to step 12 if you selected a non-
circular log or to step 14 for a circular log.
•
If
EDIT
was selected, complete the steps listed below.
a.
Press
[F1]-[F2]
to select
AM
or
PM
. Then, enter the desired
Hour
(1-12) and press
[ENT]
. (Entry of a start time earlier than the
current time will generate an error message.)
b.
Enter the desired
Minutes
and press
[ENT]
. The acceptable
range is 0 to 59.
c.
Enter the desired
Seconds
and press
[ENT]
. The acceptable
range is 0 to 59.
START DATE Prompt
11.
Press
[F1]
to accept the displayed
Start Date
or press
[F2]
to enter a
different start date. To start logging today, press
[F3]
.
•
If
OK
or
TODAY
was selected, proceed to step 12 for a non-
circular log or to step 14 for a circular log.
•
Otherwise, continue with the next prompt to
Edit
the Start Date.
a.
Enter the desired
Year
and press
[ENT]
. The acceptable range is
0 to 99.
b.
Use the [
←]
, [
→]
and
[F1]-[F4]
keys to select the desired
Month.
c.
Enter the desired
Day
and press
[ENT]
. The acceptable range is
1 to the number of days in the selected month (28, 29, 30 or
31).
Содержание DigitalFlow DF868
Страница 7: ...Chapter 1 ...
Страница 75: ...Chapter 2 ...
Страница 91: ...Chapter 3 ...
Страница 105: ...Chapter 4 ...
Страница 116: ...Chapter 5 ...
Страница 117: ...Clearing Data Introduction 5 1 Clearing Totalized Data 5 2 Deleting Site Files 5 2 Deleting Log Files 5 3 ...
Страница 121: ...Chapter 6 ...
Страница 132: ...Appendix A ...
Страница 142: ...Appendix B ...
Страница 143: ...Data Records Option Cards Installed B 1 Initial Setup Data B 2 ...
Страница 149: ...Appendix C ...
Страница 169: ...Appendix D ...