0-8
Issue 01, 04/05
CL 5
Important Notice
Software:
According to the current state of the art, software is
never completely free from errors. Before using any
software-controlled test equipment, please make sure
that the required functions operate perfectly in the
intended combination.
Defects/errors and exceptional stresses
If you have reason to believe that a safe operation of
your CL 5 is no longer possible, you have to disconnect
the instrument and secure it against unintentional
reconnection. Remove the batteries if necessary.
A safe operation is no longer possible e.g.:
The instrument shows visible damages
The instrument no longer operates perfectly
After prolonged storage under adverse conditions like
exceptional temperatures and/or especially high air
humidity, or corrosive environmental conditions.
Being subjected to heavy stresses during
transportation
Service
Every effort has been made to provide you with a
reliable product. However, should service become
necessary, GE Inspection Technologies, has estab-
lished a number of Factory Trained Service Centers.
For the location of the nearest facility refer to section
9.4 of this manual.
0-8
Issue 01, 04/05
CL 5
Important Notice
Software:
According to the current state of the art, software is
never completely free from errors. Before using any
software-controlled test equipment, please make sure
that the required functions operate perfectly in the
intended combination.
Defects/errors and exceptional stresses
If you have reason to believe that a safe operation of
your CL 5 is no longer possible, you have to disconnect
the instrument and secure it against unintentional
reconnection. Remove the batteries if necessary.
A safe operation is no longer possible e.g.:
The instrument shows visible damages
The instrument no longer operates perfectly
After prolonged storage under adverse conditions like
exceptional temperatures and/or especially high air
humidity, or corrosive environmental conditions.
Being subjected to heavy stresses during
transportation
Service
Every effort has been made to provide you with a
reliable product. However, should service become
necessary, GE Inspection Technologies, has estab-
lished a number of Factory Trained Service Centers.
For the location of the nearest facility refer to section
9.4 of this manual.
Содержание CL 5
Страница 11: ...CL 5 Issue 01 04 05 1 1 General Information 1 CL 5 Issue 01 04 05 1 1 General Information 1 ...
Страница 29: ...CL 5 Issue 01 04 05 3 1 Setting Up the CL 5 3 CL 5 Issue 01 04 05 3 1 Setting Up the CL 5 3 ...
Страница 45: ...CL 5 Issue 01 04 05 4 1 Measuring Thickness 4 CL 5 Issue 01 04 05 4 1 Measuring Thickness 4 ...
Страница 63: ...CL 5 Issue 01 04 05 6 1 I O Features 6 CL 5 Issue 01 04 05 6 1 I O Features 6 ...
Страница 73: ...CL 5 Issue 01 04 05 7 1 Specifications 7 CL 5 Issue 01 04 05 7 1 Specifications 7 ...
Страница 81: ...CL 5 Issue 01 04 05 8 1 Maintenance 8 CL 5 Issue 01 04 05 8 1 Maintenance 8 ...
Страница 83: ...CL 5 Issue 01 04 05 9 1 Appendix 9 CL 5 Issue 01 04 05 9 1 Appendix 9 ...
Страница 89: ...CL 5 Issue 01 04 05 10 1 Index 10 CL 5 Issue 01 04 05 10 1 Index 10 ...