23 | GE Oil & Gas
© 2016 General Electric Company. All rights reserved.
175-CH Spring Chamber Assembly
Bolt Spring Chamber (H) onto Cartridge Spacer (G) using six (6)
Fiberglass Washers (P) and six (6), 1/4-20 x 7/8” SHCS (Q). Bolt
Bottom Flange (K) into Cartridge Spacer (G) using eight (8), 1/4-20 x
1 1/2” HHCS (R).
Figure 5: Bolting the spring chamber