—
59
—
Operation procedures/pictures
Disassembling the cabinet assembly
Screw off the 8 tapping screws on the cabinet,
chassis and condenser sideboard to take off
the cabinet assembly as shown in Fig. 8-52.
Screw
outer cover
Fig. 8-52.
Disassembling the electric box
Screw off the 2 screws that fix the electric
installation board and unplug the lead wire
insert of compressor, fan motor and four-way
valve (not for cooling only) to take off the
electric box as shown in Fig. 8-53.
Fig. 8-53
Disassembling rear sideboard
Screw off the screws on the rear sideboard,
valve support and chassis assembly and lift it
upward to take off the rear sideboard as
shown in Fig. 8-54.
Electric box
Fig. 8-54
Screw
Electric box
Rear sideboard
Содержание AIR 326
Страница 2: ... 1 Summary and features Model Remark PRO AIR 107 IN PRO AIR 107 OUT 1Ph 230V 50Hz R410A 1 ...
Страница 4: ... 3 Model Remark PRO AIR 218 IN PRO AIR 218 OUT 1Ph 230V 50Hz R410A ...
Страница 5: ... 4 Model Remark GE AIR 326 IN1 GE AIR 326 IN2 GE AIR 326 OUT 1Ph 230V 50Hz R407C ...
Страница 6: ... 5 Model Remark GE AIR 428 IN GE AIR 428 OUT 1Ph 230V 50Hz R407C ...
Страница 20: ... 19 4 2 Outline and installation dimensions of indoor unit 20 Handle 60cm Bolt Nut Spanner ...
Страница 21: ... 20 4 3 Outline and installation dimensions of indoor units 25 32 Handle Unit mm 500 Bolt Nut Spanner ...
Страница 71: ... 70 Explosive view and parts list Explosive view of parts and components of indoor unit 9 ...
Страница 75: ... 74 Explosive view of parts and components of outdoor unit ...
Страница 77: ... 76 Explosive view of parts and components of outdoor unit frequency converter ...
Страница 79: ... 78 Explosive view of parts of outdoor unit one driving two ...
Страница 81: ... 80 Explosive view of parts of outdoor unit one driving three ...
Страница 83: ... 82 Explosive view of parts of outdoor unit one driving four ...
Страница 101: ... 100 ...