![GE HEALTHCARE Logiq Book XP series Скачать руководство пользователя страница 57](http://html.mh-extra.com/html/ge-healthcare/logiq-book-xp-series/logiq-book-xp-series_basic-service-manual_571895057.webp)
GE H
EALTHCARE
D
IRECTION
5194296-100, R
EVISION
10
LOGIQ B
OOK
XP S
ERIES
B
ASIC
S
ERVICE
M
ANUAL
Chapter 3 Installation
3-1
Chapter 3
Installation
Section 3-1
Overview
3-1-1
Purpose of Chapter 3
This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit, probes,
and external peripherals for electrical safety are included in this procedure. Also included in this section
are guidelines for transporting the unit to a new site.
3-1-2
Average Installation Time
The LOGIQ Book XP Series installation and functional checkout will take approximately one hour.
LOGIQ Book XP Series consoles with optional equipment may take slightly longer.
Table 3-1
Contents in Chapter 3
Section
Description
Page Number
3-1
Overview
3-1
3-2
Receiving and Unpacking the Equipment
3-4
3-3
Packing the Equipment
3-7
3-4
Preparing for Installation
3-8
3-5
Completing the Installation
3-9
3-6
System Configuration
3-12
3-7
Software/Option Configuration
3-25
3-8
Connectivity Installation Worksheet
3-26
3-9
Loading the System Software
3-27
Table 3-2
Average Installation Time
Description
Average Installation Time
Comments
Unpacking the system
20 minutes
Scanner wo/options
30 minutes
Dependent on the configuration that is required
DICOM* Option
30 minutes
Dependent on the amount of configuration
NOTICE
* This function is option on LOGIQ Book XP Series.