Operations Manual
Page 15
FALCON
60+ (-1)
CE
©2004 General Binding Corporation
Fig 3
Installation
1. Shipping damage should be brought to the imme-
diate attention of the delivering carrier.
2.
With assistance, carefully roll the laminator into posi-
tion over flat and even surfaces.
3.
The laminator should be positioned to allow exiting film
to flow freely to the floor (Figure 3) or a work table.
Accumulation of laminate immediately behind the lami-
nator as it exits the equipment may cause the film to
wrap around the pull rollers, resulting in a “jammed”
condition.
4.
Avoid locating the laminator near sources of heat or
cold. Avoid locating the laminator in the direct path of
forced, heated or cooled air.
5.
Leveling of the machine is a customer option. If you
choose not to level the laminator and encounter output
problems, please level the machine and try your
application again before calling for technical support.
Resting the laminator on the leveling pads prevent
the machine from rolling during set up, operation or
servicing. (Figure 4)
6.
Connect the attachment plug provided with the
laminator to a suitably grounded outlet.
AVOID
CONNECTING OTHER EQUIPMENT TO THE
SAME BRANCH CIRCUIT TO WHICH THE LAMI-
NATOR IS CONNECTED, AS THIS MAY RESULT
IN NUISANCE TRIPPING OF CIRCUIT BREAKERS
OR BLOWING FUSES.
x 4
Fig 4
Содержание Falcon 60+
Страница 3: ......
Страница 5: ...Operations Manual Page 4 2004 General Binding Corporation FALCON 60 1 CE...
Страница 7: ...Operations Manual Page 6 2004 General Binding Corporation FALCON 60 1 CE...
Страница 9: ...Operations Manual Page 8 2004 General Binding Corporation FALCON 60 1 CE...
Страница 11: ...Operations Manual Page 10 2004 General Binding Corporation FALCON 60 1 CE...
Страница 13: ...Operations Manual Page 12 2004 General Binding Corporation FALCON 60 1 CE...
Страница 15: ...Operations Manual Page 14 2004 General Binding Corporation FALCON 60 1 CE...
Страница 17: ...Operations Manual Page 16 2004 General Binding Corporation FALCON 60 1 CE...
Страница 23: ...Operations Manual Page 22 2004 General Binding Corporation FALCON 60 1 CE...
Страница 31: ...Operations Manual Page 30 2004 General Binding Corporation FALCON 60 1 CE...
Страница 33: ...Operations Manual Page 32 2004 General Binding Corporation FALCON 60 1 CE...
Страница 37: ...Operations Manual Page 36 2004 General Binding Corporation FALCON 60 1 CE...
Страница 39: ...Operations Manual Page 38 2004 General Binding Corporation FALCON 60 1 CE...
Страница 40: ......
Страница 41: ...General Binding Corporation One GBC Plaza Northbrook IL 60062 4195...