11
ZEN RAIN
ZEN RAIN • ZEN RAIN • ZEN RAIN
Preparación perfi les guía:
E
GB
Guide profi les assembly:
F
I
Préparation des profi ls guides:
Preparazione profi li guida:
Posición taladros soporte pared:
E
GB
Drilling positions at wall support:
F
Position des trous du support mural:
I
Posizione viti supporto a parete:
220
40
11
140
40
140
150
90
30
30
11
Montaje en fábrica:
E
Assembly at the factory:
GB
Montage en atelier:
F
Montaggio in fabbrica:
I
Fase 1.
Introdurre il profi lo antigoccia.
I
1.
Introduire le profi l anti-goutte.
F
Paso 1.
Introducir el perfi l antigota.
E
Step 1.
Insert the antirain drop profi le.
GB