GA600AC Sliding Gate Opener User Manual
20
Photocell Transmitters
3
芯线
Before Installing Photocells
Loosen 8 and 9 ports on J5
Terminal with a screwdriver. Make
sure the power is disconnected
before doing so.
Remove the wire jumper
between ports 8 & 9 on J5
Terminal.
7
8
9
Connecting Infrared Photocells
The below steps must be completed by licensed electrician.
Highly recommend the use of infrared photocells as an additional safety feature.
While closing, if the ray of the Infrared Photocell is blocked, the gate will stop and reverse
immediately, to protect user and property security. To install photocells, connect wiring as
per Figure 17. You must remove the wire jumper between terminal 8 and terminal 9 on J5
(ref to Figure 18).
The distance between photocell receiver and photocell transmitter should not be less than 2
meters; otherwise, the induction effect of photocell may be affected.
Figure 17
Figure 18
Photocell Receiver
2 core cable
8
9
8
9
3 core
cable