48
Gateway ALR 9250R User’s Guide
14.
With the bracket in an open position (perpendicular to the front of the
retention module), rotate the bracket to the right until it reaches the
retention module. With your thumb on the face of the bracket and your
index finger around the tab at the end of the bracket, pull the tab gently
outward and to the left to open the latch at the back of the tab.
As you open the latch on the back of the tab, slide the right edge of the
bracket onto the retention module and release the tab. The bracket
latches securely.
15.
Close the case, as described in “Closing the system” on page 5.
16.
Reconnect the power cord and turn on the system.
Installing another processor
The system is compatible with Intel Pentium II Xeon and Pentium III Xeon
processors. You can either upgrade the existing processor or install up to
three additional processors of the same speed as the original processor.
When adding a processor, order a processor upgrade kit. The kit includes
the processor, a heat sink, and latches.
It is critical that a heat sink be installed on each processor. The Pentium
family of processors may overheat and fail if it is not cooled sufficiently.
The heat sink provided with the processor in the system provides all
necessary cooling for the processor.
For the latest details on the availability of the upgrade kits, contact one of
the sources listed in the Assistance Resources document shipped with the
server.
1.
Turn off the system and disconnect the power cord.
2.
Open the case, observing the static electricity precautions in “Static
electricity precautions” on page 2.
To Install a Second Processor
Note:
If the server has less than
four processors and you
are adding one, then you
must remove the
termination board assembly
from the next Slot 2
connector before you install
the new processor. If you
plan to reduce the number
of processors in your
system, then you must
replace a processor with a
termination board
assembly.
9250R.book Page 48 Friday, April 9, 1999 9:44 AM
Содержание ALR 9250R
Страница 7: ...Contents v Index 193 9250R book Page v Friday April 9 1999 9 44 AM...
Страница 8: ...vi Gateway ALR 9250R User s Guide 9250R book Page vi Friday April 9 1999 9 44 AM...
Страница 14: ...xii Gateway ALR 9250R User s Guide 9250R book Page xii Friday April 9 1999 9 44 AM...
Страница 34: ...20 Gateway ALR 9250R User s Guide 9250R book Page 20 Friday April 9 1999 9 44 AM...
Страница 56: ...42 Gateway ALR 9250R User s Guide 9250R book Page 42 Friday April 9 1999 9 44 AM...
Страница 114: ...100 Gateway ALR 9250R User s Guide 9250R book Page 100 Friday April 9 1999 9 44 AM...
Страница 134: ...120 Gateway ALR 9250R User s Guide 9250R book Page 120 Friday April 9 1999 9 44 AM...
Страница 164: ...150 Gateway ALR 9250R User s Guide 9250R book Page 150 Friday April 9 1999 9 44 AM...
Страница 186: ...172 Gateway ALR 9250R User s Guide 9250R book Page 172 Friday April 9 1999 9 44 AM...
Страница 194: ...180 Gateway ALR 9250R User s Guide 9250R book Page 180 Friday April 9 1999 9 44 AM...
Страница 206: ...192 Gateway ALR 9250R User s Guide 9250R book Page 192 Friday April 9 1999 9 44 AM...
Страница 226: ...212 Gateway ALR 9250R User s Guide 9250R book Page 212 Friday April 9 1999 9 44 AM...