Chapter 1: Getting Started
5
Closing the system
Before closing the system, verify that all connectors and boards are
properly installed and firmly seated.
Reinstalling the top cover
After you have completed the procedures involving the back portion of the
drawer, replace the top cover.
1.
Position the top cover on the chassis, aligning the three holes on each
side and four holes in back. See the illustration Reinstalling the Top
Cover below.
Reinstalling the Top Cover
To replace the top cover
9250r_1
1
9250R.book Page 5 Friday, April 9, 1999 9:44 AM
Содержание ALR 9250R
Страница 7: ...Contents v Index 193 9250R book Page v Friday April 9 1999 9 44 AM...
Страница 8: ...vi Gateway ALR 9250R User s Guide 9250R book Page vi Friday April 9 1999 9 44 AM...
Страница 14: ...xii Gateway ALR 9250R User s Guide 9250R book Page xii Friday April 9 1999 9 44 AM...
Страница 34: ...20 Gateway ALR 9250R User s Guide 9250R book Page 20 Friday April 9 1999 9 44 AM...
Страница 56: ...42 Gateway ALR 9250R User s Guide 9250R book Page 42 Friday April 9 1999 9 44 AM...
Страница 114: ...100 Gateway ALR 9250R User s Guide 9250R book Page 100 Friday April 9 1999 9 44 AM...
Страница 134: ...120 Gateway ALR 9250R User s Guide 9250R book Page 120 Friday April 9 1999 9 44 AM...
Страница 164: ...150 Gateway ALR 9250R User s Guide 9250R book Page 150 Friday April 9 1999 9 44 AM...
Страница 186: ...172 Gateway ALR 9250R User s Guide 9250R book Page 172 Friday April 9 1999 9 44 AM...
Страница 194: ...180 Gateway ALR 9250R User s Guide 9250R book Page 180 Friday April 9 1999 9 44 AM...
Страница 206: ...192 Gateway ALR 9250R User s Guide 9250R book Page 192 Friday April 9 1999 9 44 AM...
Страница 226: ...212 Gateway ALR 9250R User s Guide 9250R book Page 212 Friday April 9 1999 9 44 AM...