PRO ACTION Setup
Page 29
1.
Loosen these two screws to
allow the Lens Gear Drives to
pivot and mate with the Flex
Gears.
2.
Pivot the LGD’s to mate with
the Flex Gear. Ensure a good
gear mesh.
3.
When positioned, tighten the
screws to secure the LGD’s in
position.
4.
Verify focus and zoom
operation.
Содержание PRO ACTION
Страница 1: ...PRO ACTION Housing Setup Use and Care Guide...
Страница 4: ...Introducing Pro Action Page 4 This page intentionally left blank...
Страница 24: ...PRO ACTION Setup Page 24 ARRI Camera install Next install the mount adapter onto the ARRI camera as shown...
Страница 48: ...PRO ACTION Operation Page 48 Install the taller feet...