2
Table of Contents
Warnings and Cautions
3
A.
Signal Words
3
1.Overview 4
1.1
Tests and record keeping
4
1.2
PC Connection
4
1.2.1
USB Connection
4
1.2.2
Ethernet Connection and E-mail
4
1.3
PC Requirements
4
1.4
Power Requirements
5
1.5
Sensor compatibility
5
1.6
Calibration Gas Cylinder Regulator Requirement
5
1.7
Dock Location
5
1.8
Delivery 5
1.9
Battery Charging
5
2.Installation 5
2.1
Installation Overview
5
2.2
IQ Administrator Pro and PostgreSQL Database Server Installation
6
2.3
IQ Database Manager Software Installation
6
2.4
IQ6 PC Software Installation
6
2.5
Install IQ Administrator Pro and PostgreSQL database.
7
2.6
Power and Connectivity
8
2.6.1
USB Connection
8
PC – Single Dock via USB
8
PC – Multi Dock via USB
8
2.6.2
Ethernet Connection
8
2.6.3
Power 8
2.7
Connecting the Calibration Gas Cylinder to the Dock(s)
8
2.7.1
Single Cylinder to Single Dock
8
2.7.2
Multiple Cylinders to Single Dock
9
2.7.3
Single Cylinder to Multiple Docks
9
2.7.4
Multiple Cylinders to Multiple Docks
10
2.7.5
Fresh Air Port Instructions
10
2.8
Initial PC- Dock Connection
10
2.8.1
PC screens
10
2.8.2
Dock screens
11
3.Software 11
3.1
Dock Status (USB Connection)
11
3.2
Dock Controls and Instrument Status
12
3.2.1
Dock Configuration
12
Hardware Configuration
13
Connection Speed
13
Audible Alarm Sensitivity Controls
13
AC Power
13
Pump Diagnostics
13
LCD Contrast Control
13
Status After Test
14
Battery
14
Calibration Interval
14
Gas Configuration
14