BreathSpec®
– Quickstart Manual
24/67
5 Installation BreathSpec® Device (Version 4G1) with
Ciruclar Gas Flow Unit (CGFU)
5.1 Installation Requirements
The following requirements must be fulfilled by the customer:
Location of Installation
•
Available space of 600 x 700 x 300 mm (W x D x H)
•
Ambient temperature of 5
– 40 °C
•
Humidity: 0-90 % RH, non-condensating
Electricity
•
Electricity supply free of interferences
•
Power Supply of 230 V ± 10%, 50- 60 Hz ± 1%
Safety
•
Availability of exhaust system for device exhaust gas tube (Sample Gas out)
Computer
•
Computer with current Microsoft Windows operating system
•
Administrator right to install G.A.S. software
INFORMATION!
To ensure correct measurements it is necessary to
connect the
supplied exhaust tube
(Sample gas out).
The exhaust system must
not generate any negative pressure
.
Содержание BreathSpec
Страница 1: ...Quickstart Manual BreathSpec G A S Gesellschaft f r analytische Sensorsysteme mbH...
Страница 23: ...BreathSpec Quickstart Manual 23 67 Please contact G A S 6 8 weeks in advance to optimize the turn around time...
Страница 37: ...BreathSpec Quickstart Manual 37 67 10 Switch on the BreathSpec...
Страница 64: ...BreathSpec Quickstart Manual 64 67 3 Start measurement with TD start button...