7
EN
2
CU
PLINT
3-phase
1-phase
AL
7 13
1
5
6
Step by step guide
(7 x T20)
1
3
4
Drill template
(see the back of the box)
5
Serial no./SSID password
6
Signal cable entrance
1.
Select the appropriate group fuse (1x6A - 3x32A) and
cable area for the electrical installation. Some countries
require earth fault breakers to be installed. Follow local
country regulations and select the appropriate earth fault
equipment for the electrical installation. NOTE! Due to
high currents for a long time in the cable, there is a high
risk of voltage drop if the cable is under-dimensioned
which can damage the electronics in an EV.
2.
Fill in the information in the Warranty form.
3.
Install the wallbox according to the installation pictures
4.
Install the electrical supply cable according to local
regulations picture
5.
Follow the instructions in pictures