16
EN
First and last GLB Wallbox should be end-terminated by SW1
DIP6 (ON), (figure 7)
GLB Wallbox with wifi module should be Master, SW1 DIP5 ON.
All other boxes are slaves, SW1 DIP5 OFF.
SW1 (DIP 5 and 6) settings
ENDTERMINATION
Example of Datalink and DLM installation, Datalink connection via junction boxes.
0 0 0 0 . 0
G L B Wi - Fi
G L B St a n d a r d
G L B St a n d a r d
G L B St a n d a r d
G L B St a n d a r d
D a t a L i n k
D a t a L i n k
D a t a L i n k
D a t a L i n k
DataLink
E-Meter
Remote control
A -
B +
A -
B +
Distribution box
Address 100
Twisted pair
Cable: Suitable for modbus
communication
Wallbox 1
Wallbox 2
Wallbox 3
Wallbox 4
Wallbox 5
Twisted
pair
Junctionbox
Junctionbox
Junctionbox
Junctionbox
Example of Datalink and DLM installation
GLB Wi-Fi
GLB Standard
Data Link
Data Link
GLB Standard
DataLink
E-Meter
Remote control
A -
B +
A -
B +
Data Link
Data Link
GLB Standard
GLB Standard
0000.0
(figure 7)
(figure 8)
(figure 9)
Assembly instructions