Example of Datalink and DLM installation
Example of Datalink and DLM installation, Datalink connection via junction boxes.
0 0 0 0 . 0
G L B Wi - Fi
G L B St a n d a r d
G L B St a n d a r d
G L B St a n d a r d
G L B St a n d a r d
D a t a L i n k
D a t a L i n k
D a t a L i n k
D a t a L i n k
DataLink
E-Meter
Remote control
A -
B +
A -
B +
Distribution box
Address 100
Twisted pair
Cable: Suitable for modbus
communication
Wallbox 1
Wallbox 2
Wallbox 3
Wallbox 4
Wallbox 5
Twisted
pair
Junctionbox
Junctionbox
Junctionbox
Junctionbox
There must always be one (1pcs) GLB Wallbox as “Master” in the
installation and it is set by SW1 DIP5. All other boxes should be
slaves and this is set by SW1 DIP6, see (figure 16).
SW1 (DIP 5 and 6) settings
ENDTERMINATION
Datalink installation should be done according to (figure 17) or
(figure 18)
Commissioning:
• Connect Data Link to GLB Modbus terminal “Data Link”
Note, Modbus connection between GLB Wallboxes must be
connected as following: A- to A- and B+ to B+ see (figure
17)(figure 18)
• Config SW1 (DIP 5-6) see (figure 16).
GLB Wi-Fi
GLB Standard
Data Link
Data Link
GLB Standard
DataLink
E-Meter
Remote control
A -
B +
A -
B +
Data Link
Data Link
GLB Standard
GLB Standard
0000.0
(figure 16)
(figure 17)
(figure 18)
Assembly instructions