background image

Part # 4519762 (01/05)

Page 6

INSTALLATION Continued

are available for each unit to be installed. One at the 

front and one at the rear of each two units being banked 

together.
1.  Level each unit by adjustment of leveling bolts or 

legs. Use a spirit level and level unit four ways; across 

front and back and down left and right edges. Level 

all other units to the first unit.

Note: Griddles may not rest evenly on the unit body if 

units are not leveled.
2.  Remove sheet metal screws at rear of unit.
3.  Attach  one  banking  plate  in  position  at  rear  by 

placing  the  1/4”  (6  mm)  diameter  holes  in  the 

banking  plate  over  the  screw  holes  in  the  rear  of 

units and fasten by replacing the sheet metal screws 

removed in Step 2.

4.  Push units into position on counter top or back bar.
5.  Remove the two acorn nuts from the sides being 

banked (one for each control panel). Place banking 

plate over the two protruding screw heads, replace 

acorn nuts and tighten.

REAR VIEW

FRONT VIEW

2.  The  correct  type  of  gas  for  which  the  unit  was 

manufactured is noted on the rating plate, and this 

type of gas must be used.

3.  The gas pressure must be checked when the unit is 

installed, to ensure that the unit gas pressure is the 

same as specified on the rating plate. If necessary, 

pressure adjustments can be made at the pressure 

regulator, supplied on each unit.

4.  Have  a  qualified  gas  technician  check  the  gas 

pressure to make certain that existing gas facilities 

(meter, piping, etc.) will deliver the BTU’s of gas 

required at the unit with no more than ½” water 

column pressure drop. When checking pressure, be 

certain that all the equipment on same gas line is 

turned to the “ON” position.

5.  The appliance and its individual shut off valve must 

be disconnected from the gas supply piping system 

during  any pressure testing of that  system at test 

pressures in excess of 1/2 PSIG. (3.45 KPA).

6.  The appliance must be isolated from the gas supply 

piping  system  by  closing  its  individual  manual 

shut off valve during any pressure testing of the gas 

supply piping system at test pressures equal to or 

less than 1/2 PSIG. (3.45 KPA).

7.  Make  certain  that  the  new  piping,  joints  and 

connections have been made in a clean manner and 

have  been  purged,  so  that  the  piping  compound, 

chips,  etc.,  will  not  clog  pilots,  valves  and/or 

controls. Use pipe joint sealant that is certified for 

use with liquefied petroleum gas.

8.  WARNING:  Check  gas  connections  for  leaks, 

using  soap  solution  or  similar  means.  Do  Not 

Check with an Open Flame.

Installation of Banking Plates

All units may be installed independently or banked with 

other GD or ED Series equipment. To ensure a matching 

and permanent fit between units, two banking plates 

Содержание Enodis GD-152H

Страница 1: ...d replacement parts Garland will have no obligation with respect to any product that has been improperly installed adjusted operated or not maintained in accordance with national and local codes or in...

Страница 2: ...e harm Installation and servicing of this product could expose you to airborne particles of glass wool ceramic bers Inhalation of airborne particles of glass wool ceramic bers is known to the State of...

Страница 3: ...ustment 8 Burner Operation 8 Fryers 8 Before Operating the Fryer 8 Pilot Burner Adjustment 8 To Operate Main Burner 8 Shutdown Instructions 8 Calibration Instructions 9 Griddles 9 Lighting Instruction...

Страница 4: ...rating plate a xed to the unit contains this information We suggest installation maintenance and repairs should be performed by your local authorized service agency listed in your information manual p...

Страница 5: ...bulb shield assembly This can be accomplished with the griddle front raised and supported by the griddle prop located on the underside of the griddle plate It is important for accurate temperature co...

Страница 6: ...If necessary pressure adjustments can be made at the pressure regulator supplied on each unit 4 Have a quali ed gas technician check the gas pressure to make certain that existing gas facilities mete...

Страница 7: ...ply 1 It is necessary that su cient room air ingress be allowed to compensate for the amount of air removed by any ventilating system Otherwise a subnormal atmospheric pressure will occur a ecting the...

Страница 8: ...shortening causes severe burns Never attempt to move a fryer when the frypot is full Drain frypot completely before moving fryer ADJUSTMENTS Continued Pilot Burner Adjustment 1 Turn thermostat knob to...

Страница 9: ...e manifold to the left of each griddle valve Open the pilot valve with a screwdriver and light the pilot with a match For the griddle equipped with thermostats the pilot and the main burner are contro...

Страница 10: ...om door and use a long thin straight blade screwdriver to adjust the valve Refer to Flame Size Chart Burner Operation The burner will light automatically from the pilot Turn the valve to the full ON p...

Страница 11: ...til it does 3 When the pilot is lit continue to hold the tap in for 20 seconds then release it If the pilot goes out wait for 5 minutes then repeat from step 1 4 When the pilot is established push the...

Страница 12: ...icular unit by the correct model number including pre x and su x letters and numbers and the serial or code number The rating plate a xed to the unit contains this information Regular Maintenance Ensu...

Страница 13: ...Part 4519762 01 05 Page 13 NOTES...

Страница 14: ...Part 4519762 01 05 Page 14 NOTES...

Страница 15: ...Part 4519762 01 05 Page 15 NOTES...

Страница 16: ......

Отзывы: