Part # 4519762 (01/05)
Page 6
INSTALLATION Continued
are available for each unit to be installed. One at the
front and one at the rear of each two units being banked
together.
1. Level each unit by adjustment of leveling bolts or
legs. Use a spirit level and level unit four ways; across
front and back and down left and right edges. Level
all other units to the first unit.
Note: Griddles may not rest evenly on the unit body if
units are not leveled.
2. Remove sheet metal screws at rear of unit.
3. Attach one banking plate in position at rear by
placing the 1/4” (6 mm) diameter holes in the
banking plate over the screw holes in the rear of
units and fasten by replacing the sheet metal screws
removed in Step 2.
4. Push units into position on counter top or back bar.
5. Remove the two acorn nuts from the sides being
banked (one for each control panel). Place banking
plate over the two protruding screw heads, replace
acorn nuts and tighten.
REAR VIEW
FRONT VIEW
2. The correct type of gas for which the unit was
manufactured is noted on the rating plate, and this
type of gas must be used.
3. The gas pressure must be checked when the unit is
installed, to ensure that the unit gas pressure is the
same as specified on the rating plate. If necessary,
pressure adjustments can be made at the pressure
regulator, supplied on each unit.
4. Have a qualified gas technician check the gas
pressure to make certain that existing gas facilities
(meter, piping, etc.) will deliver the BTU’s of gas
required at the unit with no more than ½” water
column pressure drop. When checking pressure, be
certain that all the equipment on same gas line is
turned to the “ON” position.
5. The appliance and its individual shut off valve must
be disconnected from the gas supply piping system
during any pressure testing of that system at test
pressures in excess of 1/2 PSIG. (3.45 KPA).
6. The appliance must be isolated from the gas supply
piping system by closing its individual manual
shut off valve during any pressure testing of the gas
supply piping system at test pressures equal to or
less than 1/2 PSIG. (3.45 KPA).
7. Make certain that the new piping, joints and
connections have been made in a clean manner and
have been purged, so that the piping compound,
chips, etc., will not clog pilots, valves and/or
controls. Use pipe joint sealant that is certified for
use with liquefied petroleum gas.
8. WARNING: Check gas connections for leaks,
using soap solution or similar means. Do Not
Check with an Open Flame.
Installation of Banking Plates
All units may be installed independently or banked with
other GD or ED Series equipment. To ensure a matching
and permanent fit between units, two banking plates
Содержание Enodis GD-152H
Страница 13: ...Part 4519762 01 05 Page 13 NOTES...
Страница 14: ...Part 4519762 01 05 Page 14 NOTES...
Страница 15: ...Part 4519762 01 05 Page 15 NOTES...
Страница 16: ......