COMMISSIONING OR RECOMMISSIONING
PAGE 31
7 COMMISSIONING OR RECOMMISSIONING
W A R N I N G :-
BEFORE OPERATING THIS EQUIPMENT USERS SHOULD BE MADE AWARE OF AND ENSURE
COMPLIANCE WITH THE HEALTH AND SAFETY REGULATIONS APPROPRIATE TO THIS CLASS OF
WORK. ATTENTION OF U.K. USERS IS DRAWN TO THE HEALTH AND SAFETY AT WORK ACT, 1974
& CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH REGULATIONS 1988
TAMPERING WITH SAFETY VALVES IS DANGEROUS AND ALSO INVALIDATES THE GUARANTEE.
7.1 BEFORE STARTING
Ensure familiarity with safety devices and type of control.
NOTE: Low oil pressure and high air temperature switches are pre set and should not be adjusted.
Ensure suction filter is in good condition and filter element is fitted. Make sure that any protective blank
fitted to the first stage suction is removed. Check that silencer bore and any suction pipework is clean
before reassembling.
IMPORTANT: For first commissioning run or following overhaul or after compressor has stood idle for an
extended period, MINERAL oil of the recommended grade must be used for the first 50 to 100 hours
running time. After this synthetic oil of the correct grade should be used.
Check that the inside of the crankcase is clean and filled with the correct grade of lubricant until oil level
sight glass is three quarters full. Maintain oil level to the upper limit on the sight glass .
Important:- Do
not overfill.
Remove the plug from the outer end cover, immediately above the main lubrication pump and prime the
pump suction port with the recommended oil. Replace the plug.
Turn over the compressor at least one revolution by hand, to ensure freedom of movement.
Open drain valves or remove drain plugs from each stage.
NOTE: It is not necessary to remove any inhibition lubricant which may have been applied before
despatch, unless there are specific instructions attached to the compressor stating otherwise.
Содержание Reavell H5000 Series
Страница 2: ......
Страница 18: ...SAFETY PAGE 16...
Страница 20: ...AMENDMENTS PAGE 18...
Страница 22: ...COMPRESSOR LOG SHEET PAGE 20 REMARKS DATE REMARKS DATE...
Страница 24: ...GENERAL DESCRIPTION AND OPERATION PAGE 22 4 6 LUBRICATION SCHEMATIC FLOW DIAGRAM...
Страница 26: ...GENERAL DESCRIPTION AND OPERATION PAGE 24...
Страница 36: ...OPERATION AND ROUTINE MAINTENANCE PAGE 34...
Страница 44: ...DISMANTLING AND REASSEMBLY OF VALVES PAGE 42...
Страница 50: ...FAULT GUIDE PAGE 48...
Страница 68: ...PARTS LIST PAGE 66 80 89 EXTERNAL COMPONENTS 83 4 84 1 83 5 83 6 83 3 83 2 83 1 4 2 81 1 3 4 82 4 2 1 3 4...
Страница 72: ...PARTS LIST PAGE 70 93 95 1ST STAGE CONCENTRIC VALVE 9 8 6 5 4 2 1 3...
Страница 74: ...PARTS LIST PAGE 72 96 97 2ND STAGE CONCENTRIC VALVE 2 1 3 4 5 6 5...
Страница 80: ...PARTS LIST PAGE 78...
Страница 92: ...ANCILLARY PARTS PAGE 90...
Страница 94: ...STANDARD WIRING TERMINAL NUMBERS PAGE 92...
Страница 95: ......