3-1-618    Page 8 

LUBRICATION - POWER END

 - Use only extreme 

pressure GL-5 gear oil in the crankcase. The 
crankcase oil capacity is 12 gallons (45.5 liters). Add 
oil as required to keep oil level with top of pipe elbow 
located on the side of the pump frame. Never use  
motor oils in the crankcase as they do not provide 
acceptable lubrication. 

 
The selected API GL-5 oil must have antiwear, 
antifoaming, noncorrosive and rust inhibiting 
additives.  A list of recommended grades vs. 
temperatures is located at the back of this manual 
and on the pump lubrication data plate. The list is 
based on premium quality oils having viscosity values 
that do not exceed 7,000 SSU at the minimum start-
up oil temperatures listed and viscosity values 
between 1,500 SSU and 200 SSU for crankcase oil 
temperatures listed. Oils with viscosity values 
significantly different from these values, at the 
temperatures listed, may be too thick at low 
temperatures to flow into close bearing clearances, or 
may be too thin at high temperatures to carry the 
required loads. In either case pump damage could 
occur. 
 
If a 7,000 SSU maximum viscosity at start-up cannot 
be assured, a crankcase heater is required. Also if 
crankcase oil temperatures exceed 180

°

 F (82

°

 C), 

an oil heat exchanger with a circulating pump is 
required to prevent seal damage and oil break down. 
 
For outdoor operation, the multiviscosity oils are 
preferred to provide acceptable lubrication over wide 
temperature ranges. However, when multiviscosity 
oils are not available, straight weight oils should be 
acceptable, if care is taken to stay within the listed  
temperature ranges. Straight weight oils are also 
ideal in pumps used indoors, when ambient 
temperatures are controlled. 

The oil level in the pump should be checked 
frequently. Add oil through the breather opening. The 
breather can be removed by rotating and lifting. Keep 
the breather tightly in place while the pump is 
operating to prevent moisture and dirt from entering 
the crankcase. On pumps equipped with a 
replaceable filter element type breather, clean the 
element frequently and replace the element every six 
months.  When operating in very dusty or dirty 
conditions, more frequent replacement may be 
necessary.

 

 

If the pump has been stored or shut down for an 
extended period, the crankcase should be drained 
and filled with new oil before start-up. 

The GD-250 Pump is NOT equipped with any type of 
oil circulating pump. It is up to the customer to 
provide an independently driven, auxiliary lubrication 
pump. The auxiliary pump will provide filtered oil to 
the oil manifold mounted on the crosshead inspection 
plate. 

The oil pump must have a minimum flow capacity of 8 
gallons per minute. 

The direction of rotation of the input shaft is indicated 
by an arrow located on the frame. 

 

                    

   

 

WARNING 

 

Use only extreme pressure API GL-5 gear 
oil in the crankcase, which has the required 
additives and viscosity.  The use of motor 
oils in the crankcase does not provide 
acceptable lubrication and voids the 
warranty. 

                    

   

 

WARNING 

 

Do not operate the GD-250 pump below 50 
RPM.  

   

 

WARNING 

 

A minimum inlet oil pressure of 50 PSIG 
(3.45 bar) and oil viscosity of 200 SSU must 
be maintained at all times.  Failure to 
observe this warning could result in severe 
pump damage from lack of adequate 
lubrication and voids the warranty. 

Содержание GD-250

Страница 1: ...GARDNER DENVER 3 1 618 Version 1 January 2011 TRIPLEX PISTON PUMP 5 STROKE MODEL GD 250 WELL SERVICE OPERATING AND SERVICE MANUAL Rental Pump Supplied By...

Страница 2: ...ed distributor service technicians are factory trained and skilled in pump maintenance and repair They are ready to respond and assist you by providing fast expert maintenance and repair services For...

Страница 3: ...operation and minimum downtime DANGER Danger is used to indicate the presence of a hazard which will cause severe personal injury death or substantial property damage if the warning is ignored WARNIN...

Страница 4: ...tions 7 Crankcase Oil Requirements 16 Gardner Denver Horizontal Pump Recommended System Layout for Proper Performance 16 Net Positive Suction Head Required NPSHR at Fluid Cylinder Suction Connection w...

Страница 5: ...ting and Cleaning Danger Notice 5 6 Hydraulic Puller Danger Notice 2 INSTALLATION AND OPERATING INSTRUCTIONS SECTION 2 7 Lifting and Moving Equipment Danger Notice 2 Location 7 Lubrication Packing 12...

Страница 6: ...or Temperature Correction Char 21 Wedge Puller Danger Notice 2 LIST OF ILLUSTRATIONS Figure Description Page Figure 1 View of the Eccentric thru the Hood Opening Step 1 18 Figure 2 View of the Eccent...

Страница 7: ...g and service manuals should be readily available for operator and maintenance personnel use Read and follow all the precautions and instructions contained in these manuals If any of these documents a...

Страница 8: ...e handle to avoid losing control of the hammer while swinging and striking Carefully swing the hammer to avoid striking themselves another person and objects other than the targeted wedge Avoid swingi...

Страница 9: ...o lift a pump package unit subassemblies or individual components and you observe the equipment is tilting or appears unbalanced lower the equipment and adjust the lifting device to eliminate these im...

Страница 10: ...han every six months if pressures above 2 500 PSI are used in the discharge system or if corrosive flammable or hot over 110 F fluids are being pumped Before starting the pump the first time and perio...

Страница 11: ...s must be taken to avoid possible personal injury death and or equipment damage from explosion fire or burns HIGH PRESSURE LIQUID JETTING BLASTING AND CLEANING Pressure or flow directing devices often...

Страница 12: ...tion These components should all be tagged with their tested pressure capabilities together with the date testing was performed Always be aware of the pressure level in the system and never connect an...

Страница 13: ...supported independently of the pump to insure that no strain is imposed in the pump by misalignment or improperly fitted pipe PRESSURE RELIEF VALVE The pump must be protected from excessive discharge...

Страница 14: ...f care is taken to stay within the listed temperature ranges Straight weight oils are also ideal in pumps used indoors when ambient temperatures are controlled The oil level in the pump should be chec...

Страница 15: ...the crankcase Drain all water accumulation from the bottom of crankcase Check all nuts and screws and tighten if necessary Fill crankcase with oil of proper grade to proper level Quantity on the data...

Страница 16: ...th a valve seat puller Wipe the tapered surface of the valve seat and pump valve deck in the fluid cylinder with a clean cloth Lower the seat into the port taper and then lift slightly and drop If the...

Страница 17: ...nd rust in the stuffing box pilot bores in the frame Install the packing in the box Place a new gasket in the stuffing box groove The gasket chamfered edge must face out to prevent gasket pinching whe...

Страница 18: ...e placed over a lock pin which has been inserted in a lock pin hole in the gland When using self adjusting packing tighten the gland nut firmly after assembling it metal to metal with the stuffing box...

Страница 19: ...ot contaminate the crankcase oil CROSSHEAD AND PINS Crossheads can be removed through the oil stop head openings Crossheads are equipped with straight pins secured on each end by setscrews and locknut...

Страница 20: ...re Tighten oil stop head gland to prevent seal movement while pump is in operation These oil stop head seals are nonadjustable When crankcase oil leakage occurs past seals the seals should be replaced...

Страница 21: ...the crankcase the oil and filter should be changed Drain and clean out the crankcase before putting in new oil Replace the oil stop head seals before running the pump We recommend oil stop head seals...

Страница 22: ...e or grade used A crankcase heater and or an oil heat exchanger may be needed to meet these requirements Crankcase capacity is 12 gallons 45 4 liters WARNING Failure to follow these lubrication requir...

Страница 23: ...y into tank outlet 4 A short straight suction line is preferred from the tank to the pump If this is not possible use as few bends as possible and use long radius elbows The smallest portion of the li...

Страница 24: ...3 1 618 Page 18 FIGURE 1 STEP 1 FIGURE 2 STEP 2...

Страница 25: ...3 1 618 Page 19 FIGURE 3 STEP 3 FIGURE 4 STEP 4...

Страница 26: ...d minimum plunger sizes Interpolate between NPSH curves for each plunger size NPSHR is defined at a 3 flow drop below maximum capacity Added suction head above that shown by the curves must be provide...

Страница 27: ...3 1 618 Page 21 CORRECTION CHART FOR TEMPERATURE OR VISCOSITY...

Страница 28: ...0 592 64 60 20 45 40 3 106 0 35 9 0 3 9 67 45 800 176 81 00 677 73 80 23 35 35 2 120 0 39 9 8 4 1 74 50 900 198 91 00 762 83 00 26 30 31 3 135 0 41 10 7 4 3 82 58 1000 220 100 7 896 92 10 29 20 28 2 1...

Страница 29: ...mbly 2 Valve propped open 2 Remove prop 3 Pump cavitating 3 See Cavitation Fluid Knock or Hammer problem 4 Fluid leakage 4 Replace fluid end seals 5 Erroneous gauge reading 5 Recalibrate or replace ga...

Страница 30: ...13 Multiple pumps operating in 13 Use a suction stabilizer phase on each pump Separate lines may also be needed Suction or Discharge Line Vibration 1 Line s not supported 1 Install supports or hangers...

Страница 31: ...il stop head packing 2 Replace packing 3 Oil level too high in 3 Reduce oil level crankcase 4 Excessive crosshead wear 4 Replace crosshead 5 Pressure in crankcase 5 Clean or replace air breather Oil S...

Страница 32: ...temperature 5 Lube oil pump failure 5 Replace oil pump 6 Low oil level in sump 6 Check oil level frequently and add oil as required 7 Contaminated oil in sump 7 Check oil condition frequently 8 Cavita...

Страница 33: ...ad Pin 2 0015 2 0020 50 838 50 851 Bore in Connecting Rod Bushing for Eccentric 10 499 10 505 266 675 266 827 Crosshead Pin Diameter 2 0005 2 0000 50 8127 50 8000 Bore in Crosshead for Pin 2 0010 2 00...

Страница 34: ...Service Department Telephone 800 682 9868 FAX 217 223 1581 For Domestic parts information Contact Gardner Denver Fluid Transfer Division 2200 South Prospect Oklahoma City OK 73129 Telephone 405 677 57...