13-10-615 Page 45
REMOTE MOUNTED ELEVATED COOLER
ASSEMBLY PROCEDURE
- The Compressor package will
be built and tested with the coolers mounted on the package. On enclosed units, the fan motor will be
disconnected after test and the vent fan motor connected in its place. The vent fan will be mounted in the
enclosure. A contactor (starter) will be shipped loose and remote mounted with the cooler by others upon
start-up at the job site. The control box will be wired for remote elevated coolers at the factory.
NOTICE
All requirements of local codes should be followed.
When connecting pipe fittings to the cooler, support the threaded coupling with a pipe wrench when
tightening the connection. Use silicone sealant on all steel to aluminum threaded connections. All piping
should be firmly supported to avoid strain on the cooler manifold and connections. Flexible connections
should be installed in all interconnecting piping, adjacent to the cooler, to avoid transmitting piping weight
or vibrations to the cooler elements. Before beginning installations, check to be sure that no debris or
foreign matter remains in the couplings or cooler bodies. Be certain interconnecting piping is clean to
avoid clogging the cooler passages.
Figure 5-5 – COOLER DRAIN DETAIL
Содержание AUTO SENTRY EAU99P
Страница 13: ...13 10 615 Page 12 Figure 1 6 PACKAGE AIR OIL FLOW DIAGRAM 202EDM797 Ref Drawing ...
Страница 35: ...13 10 615 Page 34 Figure 4 7 CONTROL SCHEMATIC COMPRESSOR AT FULL LOAD 206EAU797 B Ref Drawing ...
Страница 38: ...13 10 615 Page 37 Figure 4 10 WIRING DIAGRAM WYE DELTA ES CONTROLLER AIR COOLED 202EAU546 D Ref Drawing ...
Страница 40: ...13 10 615 Page 39 205EAU546 D Ref Drawing Page 2 of 2 ...
Страница 44: ...13 10 615 Page 43 Figure 5 3 FLOW DIAGRAM 210EAU797 B Ref Drawing ...