13-18-612 Page 20
3-2
Before removing the oil filler plug, always stop the unit and release air pressure,
lockout and tagout the power supply to the compressor package. Failure to release
pressure or properly disconnect the power may result in personal injury or death.
2.
Air Filter
- Inspect the air filter to be sure they are clean and the assembly is sealed tight. Refer to
Section 7, for complete servicing instructions. Be sure the inlet line is clean and sealed tight.
3.
Couplings
- Check setscrews for tightness. See Section 8.
4.
Piping
- Refer to
Section 2, “Installation,”
and make sure piping meets all recommendations.
5.
Electrical
- Check the wiring diagrams furnished with the unit to be sure it is properly wired. See
Figure 4-3 and Figure 4-4, pages 31 and35, for general wiring diagrams and Section 2, for installation
instructions.
6.
Grounding
- Equipment must be properly grounded according to Gardner Denver Guidelines for
proper wiring, grounding and feed power conditioning.
Failure to properly ground the compressor package could result in controller
malfunction.
N
N
N
O
O
O
T
T
T
I
II
C
C
C
E
E
E
Read the Operator’s Manual before operating the compressor.
7.
Rotation
- Check for correct rotation of all electric motors:
Use controller “JOG MODE” to bump compressor motor. Proper rotation shall be
counterclockwise when facing the compressor shaft end.
Use c
ontroller “JOG MODE” to bump heat exchanger cooling fan. Proper rotation shall be
clockwise when facing intake side of fan.
Use c
ontroller “JOG MODE” to bump main motor cooling fan. Proper rotation is achieved when
cooling air is discharged over the main motor body or when fan rotation matches that indicated
by the arrow decal affixed to the fan hub, as viewed via the serrated cutout on the fan shroud.
See Figure 3-1 for details.
Содержание AirSmart VS80-110B
Страница 31: ...13 18 612 Page 30 4 5 Figure 4 2 PIPING AND INSTRUMENTATION ILLUSTRATION 300CGE797 A Ref Drawing...
Страница 33: ...13 18 612 Page 32 4 7 300CGE546 04 Ref Drawing Page 2 of 4...
Страница 34: ...13 18 612 Page 33 4 8 300CGE546 04 Ref Drawing Page 3 of 4...
Страница 35: ...13 18 612 Page 34 4 9 300CGE546 04 Ref Drawing Page 4 of 4...
Страница 37: ...13 18 612 Page 36 4 11 301CGE546 B Ref Drawing Page 2 of 4...
Страница 38: ...13 18 612 Page 37 4 12 301CGE546 B Ref Drawing Page 3 of 4...
Страница 39: ...13 18 612 Page 38 4 13 301CGE546 B Ref Drawing Page 4 of 4...
Страница 41: ...13 18 612 Page 40 4 15 302CGE546 05 Ref Drawing Page 2 of 4...
Страница 42: ...13 18 612 Page 41 4 16 302CGE546 05 Ref Drawing Page 3 of 4...
Страница 43: ...13 18 612 Page 42 4 17 302CGE546 05 Ref Drawing Page 4 of 4...
Страница 45: ...13 18 612 Page 44 4 19 303CGE546 B Ref Drawing Page 2 of 4...
Страница 46: ...13 18 612 Page 45 4 20 303CGE546 B Ref Drawing Page 3 of 4...
Страница 47: ...13 18 612 Page 46 4 21 303CGE546 B Ref Drawing Page 4 of 4...
Страница 70: ...13 18 612 Page 69 9 2 Figure 9 1 MINIMUM DISCHARGE PRESSURE CHECK VALVE...
Страница 86: ...NOTES...
Страница 87: ...NOTES...