13-18-612 Page 14
2-2
LOCATION
- The compressor package shall be installed in a clean, well-lighted, well-ventilated area with
ample space all around for maintenance. Select a location that provides a cool, clean, dry source of air.
In some cases it may be necessary to install duct works to reach a source of adequate cooling air or to
direct cooling air in and out of the compressor package, to prevent recirculation (e.g., hot cooling air
entering the fresh air inlet). The package is designed to operate at ambient temperatures ranging from
40
F to 113
F (at up to 1000 meter elevation). Contact Gardner Denver for package operation at
conditions exceeding the stipulated values.
A typical ventilation arrangement is shown in Figure 2-1.
Figure 2-1
– TYPICAL COMPRESSOR ROOM
When selecting the compressor package location, be aware that its noise level may increase above its
advertised free-field condition by reflections from nearby objects (e.g., walls, machinery, etc) or by noise
from nearby machinery.
Air Cooled Units
- Separate air and oil coolers are supplied as standard equipment on all air cooled
packages. The heat exchangers require sufficient cooling air flow to operate efficiently
– please refer to
Section 6, Fig 6-1 of this manual for detailed instructions on the operation and maintenance of air cooled
heat exchangers, including minimum heat exchanger cooling and enclosure ventilation requirements.
Cooling air for the heat exchangers, main motors, and electronics box is drawn in at the intake grill end of
the enclosure and is exhausted through a roof vent. Refer to Package Illustrations on, Figure 1-2, and
Figure 1-3, pages 9 and 10 for hardware details.
Do not block flow of air entering or exiting the enclosure - allow a minimum of 3-1/2 feet (1.1 m) clearance
to the nearest obstruction all around and on top.
Water Cooled Units
– Separate brazed plate-type coolers for air and oil services are supplied on water
cooled packages. The heat exchangers require sufficient cooling water flow to operate efficiently
– please
refer to Section 6 of this manual for detailed instructions on the operation and maintenance of water
cooled heat exchangers, including minimum cooling water flow requirements. Refer to Package
Illustrations on Figure 1-4 and Figure 1-5, pages 11 and 12, for hardware details.
Содержание AirSmart VS80-110B
Страница 31: ...13 18 612 Page 30 4 5 Figure 4 2 PIPING AND INSTRUMENTATION ILLUSTRATION 300CGE797 A Ref Drawing...
Страница 33: ...13 18 612 Page 32 4 7 300CGE546 04 Ref Drawing Page 2 of 4...
Страница 34: ...13 18 612 Page 33 4 8 300CGE546 04 Ref Drawing Page 3 of 4...
Страница 35: ...13 18 612 Page 34 4 9 300CGE546 04 Ref Drawing Page 4 of 4...
Страница 37: ...13 18 612 Page 36 4 11 301CGE546 B Ref Drawing Page 2 of 4...
Страница 38: ...13 18 612 Page 37 4 12 301CGE546 B Ref Drawing Page 3 of 4...
Страница 39: ...13 18 612 Page 38 4 13 301CGE546 B Ref Drawing Page 4 of 4...
Страница 41: ...13 18 612 Page 40 4 15 302CGE546 05 Ref Drawing Page 2 of 4...
Страница 42: ...13 18 612 Page 41 4 16 302CGE546 05 Ref Drawing Page 3 of 4...
Страница 43: ...13 18 612 Page 42 4 17 302CGE546 05 Ref Drawing Page 4 of 4...
Страница 45: ...13 18 612 Page 44 4 19 303CGE546 B Ref Drawing Page 2 of 4...
Страница 46: ...13 18 612 Page 45 4 20 303CGE546 B Ref Drawing Page 3 of 4...
Страница 47: ...13 18 612 Page 46 4 21 303CGE546 B Ref Drawing Page 4 of 4...
Страница 70: ...13 18 612 Page 69 9 2 Figure 9 1 MINIMUM DISCHARGE PRESSURE CHECK VALVE...
Страница 86: ...NOTES...
Страница 87: ...NOTES...