13-10-618 Page 24
SECTION 3
STARTING & OPERATING PROCEDURES
PRESTART-UP INSTRUCTIONS
- A new unit as received from the factory has been tested and then
prepared for shipping only. Do not attempt to operate the unit until checked and serviced as follows:
1.
Compressor Oil
- Check the oil level in the reservoir. Add oil only if the oil level gauge reads in the
red “ADD OIL” range. Do not mix different type oils. The unit is shipped filled with Gardner Denver
AEON™ 9000SP Lubricating Coolant which is suitable for the first 8000 hours under normal
operating conditions.
REPLACE OIL FILTER EVERY 1000 HOURS
.
Initial fill, or filling after a complete draining of the system, may show the oil level in the yellow
“EXCESS OIL” range. After start-up, the oil will fall into the green operating range as system
components are filled. If necessary, add oil to bring the level to the top of the green range as read
when the unit is operating at full load and normal pressure. See Figure 5-6, page 54.
NOTICE
Regular maintenance and replacement at required intervals of the oil filter, air
filter and air/oil separator is necessary to achieve maximum service and
extended drain intervals of AEON 9000SP synthetic lubricant. Use only genuine
Gardner Denver filters designed and specified for this compressor.
Before removing the oil filler plug, always stop the unit and release air
pressure, lockout and tagout the power supply to the starter. Failure to release
pressure or properly disconnect the power may result in personal injury or
death.
During unloaded operation and after shutdown, the system will partially drain back into the oil
reservoir and the oil level may read higher than when operating on load. DO NOT DRAIN OIL TO
CORRECT; on the next loaded cycle or start, oil will again fill the system and the gauge will
indicate the operating level.
2.
Air Filter
- Inspect the air filter to be sure it is clean and tightly assembled. Refer to Section 6, “Air
Filter,” for complete servicing instructions. Be sure the inlet line, if used, is tight and clean.
3.
Coupling
- Check all bolts and cap screws for tightness. See Section 7.
4.
Piping
- Refer to Section 2, “Installation,”
and make sure piping meets all recommendations.
Содержание AirSmart EAU99T
Страница 13: ...13 10 618 Page 12 Figure 1 6 PACKAGE AIR OIL FLOW DIAGRAM 202EDM797 Ref Drawing...
Страница 39: ...13 10 618 Page 38 Figure 4 8 CONTROL SCHEMATIC COMPRESSOR AT FULL LOAD 206EAU797 B Ref Drawing...
Страница 42: ...13 10 618 Page 41 Figure 4 11 WIRING DIAGRAM WYE DELTA 329EAU546 A Ref Drawing Page 1 of 2...
Страница 43: ...13 10 618 Page 42 329EAU546 A Ref Drawing Page 2 of 2...
Страница 44: ...13 10 618 Page 43 Figure 4 12 WIRING DIAGRAM WYE DELTA 330EAU546 A Ref Drawing Page 1 of 2...
Страница 45: ...13 10 618 Page 44 330EAU546 A Ref Drawing Page 2 of 2...
Страница 49: ...13 10 618 Page 48 Figure 5 3 FLOW DIAGRAM 210EAU797 B Ref Drawing...