963KFSIc – Page 4 – 10/08
3)
Decide whether you want the tub to be on the left or right side. With the Center Shelf Assembly
(Rc) lying face down, place the apron assembly so that the tub opening is on the desired side.
Fasten in place with six 4x30mm Phillips Screws (C) through the pocket drilled holes in the aprons.
See Figure 3.
Fig. 3
4)
Glue two Dowels (D) into the two holes in the narrow side of each Leg (Sc)near the top.
Attach a Leg (Sc) to each end of the Center Shelf Side Aprons with two dowels in the
predrilled holes. See Figure 4.
Attach the legs to the Front Apron (Qc) and Back Apron (Oc) with two 8x60mm Hex Bolts
(Ec), Washers (Fc) and Hex Nuts (Gc) in each pair of holes. See Figure 4a. Glue Dowels (
D
)
into the inner holes below the tub opening in the Front Apron (Qc) and two into the Back
Apron (Oc). See Figure 4b.
C
Rc
C
C
C
C
C
Ec
Ec
Ec
Ec
Ec
Ec
Ec
Fc
Gc
Fc
Gc
Fc Fc
D
D
Sc
Sc
Sc
Sc
Shown with tub opening
on the left side.
Fig. 4b
D
D
Oc
Qc
Oc
Qc
Ec
Hc
C
x6
D
x12
Ec
x8
Gc
x8
Fc
x8
Fig. 4
Fig. 4a
Fig. 4a