963KFSIc – Page 3 – 10/08
963KFSIc Potting Bench
ASSEMBLY INSTRUCTIONS
Fig. 1
2)
Glue two Wood Dowels (D) into each end of both Center Shelf Side Aprons (Pc). Spread a light
film of glue in the two holes in the Center Shelf Front Apron (Qc) and Center Shelf Back Apron
(Oc).
Attach the four aprons together with the dowels. Pocket drilled holes must all face the same
direction. See Figure 2.
Fig. 2
TOOLS REQUIRED:
4mm Hex Wrench (provided), Phillips Screwdriver,
Adjustable Wrench, Padded Hammer or Rubber Mallet, Outdoor Wood Glue
1)
Glue four Wood Dowels (D) into the Hutch Right Side (Kc): one in the highest hole along the back
edge, one in the third hole down, one in the second hole from the bottom, and one in the middle
hole in the row across the cente r. Repeat for the Hutch Left Side (Jc).
Insert Hutch Shelf (Nc) over the Dowel in the center of Hutch Right Side (Kc) so that the predrilled
holes in both pieces line up. Insert two 6x50mmm Hex Screws (Ac) through the holes in the Side
into the shelf and using the provided Hex Wrench (Hc), fasten securely.
Attach the Hutch Shelf Back (Lc) to the Hutch Right Side with a 6x50mm Hex Screw (Ac) in the
other hole. Insert one 4x40mm Phillips Screw (B) into the predrilled hole in the bottom of the shelf
and into the back.
Attach the Hutch Apron (Mc) over the bottom Dowel and fasten with a Hex Screw.
Repeat for the Hutch Left Side (Jc). See Figure 1.
Kc
D
D
Ac
Ac
Ac
D
D
Ac
H
Lc
Jc
Mc
Nc
B
D
D
Pc
D
D
D
D
D
D
Oc
Pc
Qc
D
x8
D
x8
Ac
x8
B
x1
Fig. 1a