
.
OPERATION
DETAILED CONTROLS AND GAUGES
HEATER AND DEFROSTER CONTROLS
(If equipped)
Heater and Defroster Control Panel
(1)
(2)
(3)
Vent selector switch
FRESH/RECIRC selector switch
Temperature control switch
(4)
(5)
(6)
Air flow selector switch
OFF switch
Defroster selector lever
Vent Selector Switch (Sending Air to Face)
If this switch (1) is pressed, the air from the heater is all directed to
the face.
3 - 44
Содержание PC78MR-6
Страница 2: ... 1 1 ...
Страница 4: ... FOREWORD FOREWORD 1 3 ...
Страница 5: ... FOREWORD FOREWORD 1 4 ...
Страница 15: ... ...
Страница 16: ... 2 1 ...
Страница 20: ... SAFETY SAFETY LABELS LOCATION OF SAFETY LABELS 2 5 ...
Страница 55: ... ...
Страница 56: ... 3 1 ...
Страница 195: ... ...
Страница 196: ... 4 1 ...
Страница 271: ... ...
Страница 272: ... 5 1 ...
Страница 275: ... ...
Страница 276: ... 6 1 ...
Страница 294: ... ...
Страница 295: ... PC78MR 6 GALEO HYDRAULIC EXCAVATOR Form No TEN00074 00 2005 KOMATSU All Right Reserved Printed in Japan 04 05 ...