.
MAINTENANCE
MAINTENANCE PROCEDURE
MAINTENANCE
MAINTENANCE PROCEDURE
8. Insert lock pin (2) in the hole of the teeth and hit it until its top
is the same level as the surface of teeth (1).
9. After replacing a bucket tooth, always check the following.
1) After the lock pin has been knocked in completely, check
that it is secured by the point and surface.
2) Lightly hit lock pin (2) in the reverse direction from which it
was hit in.
3) Lightly hit the tip of the point from above and below, and hit
its sides from right and left.
4) Confirm that rubber pin lock (3) and lock pin (2) are set as
shown in the figure.
The life of the teeth can be lengthened and the frequency of its replacement can be reduced by turning it upside
down so that it will wear evenly.
Replace the rubber pin lock and locking pin at the same time as replacing the teeth. This makes it possible to prevent
the teeth from falling out.
4 - 38
Содержание PC78MR-6
Страница 2: ... 1 1 ...
Страница 4: ... FOREWORD FOREWORD 1 3 ...
Страница 5: ... FOREWORD FOREWORD 1 4 ...
Страница 15: ... ...
Страница 16: ... 2 1 ...
Страница 20: ... SAFETY SAFETY LABELS LOCATION OF SAFETY LABELS 2 5 ...
Страница 55: ... ...
Страница 56: ... 3 1 ...
Страница 195: ... ...
Страница 196: ... 4 1 ...
Страница 271: ... ...
Страница 272: ... 5 1 ...
Страница 275: ... ...
Страница 276: ... 6 1 ...
Страница 294: ... ...
Страница 295: ... PC78MR 6 GALEO HYDRAULIC EXCAVATOR Form No TEN00074 00 2005 KOMATSU All Right Reserved Printed in Japan 04 05 ...