.
MAINTENANCE
MAINTENANCE PROCEDURE
EVERY 2000 HOURS MAINTENANCE
Maintenance for every 50, 100, 250, 500 and 1000 hours service should be carried out at the same time.
CHECK PTO GEAR CASE, ADD OIL
WARNING
The parts and oil are at high temperature immediately after the engine is stopped, and may cause serious burns. Wait for the
temperature to go down before starting the operation.
If there is still pressure remaining inside the case, the oil or plug may fly out.
Loosen the plug slowly to release the pressure.
Refill capacity: 0.4 liters (0.11 US gal)
1. Remove oil inspection plug (G) and check that the oil is near
the bottom of the check hole. If the oil level is low, add oil
through oil filler (F) until the oil level is close to the bottom of the
hole of plug hole.
2. Install plug (G).
CLEAN, CHECK TURBOCHARGER
Contact your Komatsu distributor for cleaning and inspection.
CHECK ALTERNATOR, STARTING MOTOR
The brushes may be worn or the bearing may have run out of grease, contact your Komatsu distributor for inspection
and repairs.
If the engine is started frequently, have this inspection carried out every 1000 hours.
CHECK ENGINE VALVE CLEARANCE, ADJUST
As special tools is required for removing and adjusting the parts, you should request service from your Komatsu
distributor.
4 - 72
Содержание PC78MR-6
Страница 2: ... 1 1 ...
Страница 4: ... FOREWORD FOREWORD 1 3 ...
Страница 5: ... FOREWORD FOREWORD 1 4 ...
Страница 15: ... ...
Страница 16: ... 2 1 ...
Страница 20: ... SAFETY SAFETY LABELS LOCATION OF SAFETY LABELS 2 5 ...
Страница 55: ... ...
Страница 56: ... 3 1 ...
Страница 195: ... ...
Страница 196: ... 4 1 ...
Страница 271: ... ...
Страница 272: ... 5 1 ...
Страница 275: ... ...
Страница 276: ... 6 1 ...
Страница 294: ... ...
Страница 295: ... PC78MR 6 GALEO HYDRAULIC EXCAVATOR Form No TEN00074 00 2005 KOMATSU All Right Reserved Printed in Japan 04 05 ...