2. TRANSPORT AND INSTALLATION.
2.1. TRANSPORT AND PACKAGING.
Knocks and sudden movements must be avoided when transporting the equipment. In any case, the packaging
must be protected from water.
HANDLE THE EQUIPMENT CAREFULLY, IT WILL LAST LONGER !
2.2. ELECTRICAL SUPPLY INSTALLATION.
The Plasma Cutting Equipment location must satisfy the following requirements:
Place: Dry and ventilated, far enough away from the cutting area in order to prevent the metal dust caused by the
cutting process from getting into the equipment.
Electrical installation. Electrical elements of the installation.
Protection system
Gala Cut
700
Connection
plug.
16A 3P + T
Magnetother
mal switch
(Curve “D”)
3P 15 A
Differential
circuit
breaker.
(Minimum)
3P 25A/300 mA
DO NOT FORGET TO FIT THE EARTH CONNECTION INTO THE PLUG.
Power supply hose (RVK-1KV).
GALA CUT 700
Length
400-440 V
15 m
2.5 mm
2
15-50 m
4 mm
2
ELECTRICAL INSTALLATIONS SHOULD ONLY BE HANDLED BY SPECIALISED PERSONNEL.
2.3. PNEUMATICINSTALLATION.
On the rear front of the equipment is the air inlet for the pneumatic installation. A
semi-automatic discharge pneumatic filter is located at this inlet.
Recommended compressor for the installation: 4 CV - 480 l/min
Working pressure:
5.5 ÷ 6.0 bar (No-load- Airless)
5.0 ÷ 5.5 bar (For cutting with air flowing through the torch).
Содержание 463.00.00
Страница 13: ...GALA CUT 700 13 ...
Страница 24: ...GALA CUT 700 24 NOTES ...
Страница 35: ...GALA CUT 700 35 NOTES ...
Страница 37: ...Esquema eléctrico Gala Cut 700 U1 3Ph 400 440 V 50 60 Hz Ref 46300000 13 08 2014 ...
Страница 38: ...REPUESTOS GALA CUT 700 REF 46300000 28 6 17 HR 46300000V2 1 2 3Ph 400 440 V 50 60Hz ...