GALaxy eHydro Elevator Controller Section 3
– GALaxy Startup and Adjustment
3-2
3.2 Start-Up Procedures
3.2.1 Requirements for a running platform during initial startup
1)
Wire Hydraulic Pumping Unit and Main Line Power as shown in the job connection diagrams.
2)
If elevator requires a Governor, install and wire the Governor as shown in the job connection
diagrams.
3)
Add temporary connections on the GALX-1121 Main I/O Board and on the I/O expansion boards
as shown in Figures 1, 2, and 3.
4)
Set the toggle switches on the Main I/O Board as shown in Figure 3.
5)
Place CN18 on pins 2 and 3, in the temporary
“Test Mode” configuration, on the GALX-1121 Main
I/O Board, as shown in Figure 3.
All temporary connections must be removed before placing the elevator in service.
Figure 3-0: Typical I/O Expansion Board
Fire I/O Board
Figure 3-1: GALX-1121 Main I/O Board With
Run Bug. See Figure 3-2 For
Run Bug Stop Switch.
Содержание GALaxy eHydro
Страница 50: ...GALaxy eHydro Elevator Controller Section 4 Troubleshooting 4 4 Figure 4 1 Main CPU NTS and Safety PAL System ...
Страница 66: ...GALaxy eHydro Elevator Controller Section 5 LCD Interface 5 2 5 2 LCD Menus 5 2 1 Elevator Status Figure 5 1 ...
Страница 83: ...GALaxy eHydro Elevator Controller Section 5 LCD Interface 5 19 5 2 5 2 Remove Relocation I O Figure 5 16 ...
Страница 87: ...GALaxy eHydro Elevator Controller Section 5 LCD Interface 5 23 5 2 8 1 Group Comm Status Figure 5 20 ...
Страница 88: ...GALaxy eHydro Elevator Controller Section 5 LCD Interface 5 24 5 2 8 2 Group Can Comm Status Figure 5 21 ...
Страница 89: ...GALaxy eHydro Elevator Controller Section 5 LCD Interface 5 25 5 2 8 3 Car Can Comm Status Figure 5 22 ...
Страница 91: ...GALaxy eHydro Elevator Controller Section 5 LCD Interface 5 27 5 2 8 5 SPI Comm Status Figure 5 24 ...