background image

GABRIEL KERAMIK AB

26

20mm

41

42

43

Cassette assembly in round and rectangular tiled stoves

Mount the vermiculite plate in the 

bottom.

Protect the brass frame and tiles 

around the cassette with   ma-

sking tape to ensure a neat silicon 

seal. 

When the cassette is in perfect 

position, pull it out again approx. 

20 mm and apply a silicon string 

just inside the edge around the 

brass frame, then push the cassette 

back in. Even the seal with a wet 

finger (to dip the finger in water 

with dish-washing detergent is 

an easy way to get a neat silicon 

seal). Remove the masking tape. 

Insulate behind the cassette, 

around the sides and in the front 

edge between the cassette and the 

body. 

NOTE! 

The cassette is installed in  

the same way in round and  

rectancular stoves.

Содержание AVANTI G861

Страница 1: ...l installation sequence 6 Assembly 7 18 Radiation plate installation 19 Tiles and cassette Tiling preparations 20 Tiling assembly 21 Tiling recommendations 22 Cassette assembly 24 Fan installation 27...

Страница 2: ...st report nr 39 8796 DECLARED PERFORMANCE Essential characteristics Performance Harmonized technical specification Reaction to fire A1 WT Distance to combustable Behind 50mm material Side 300mm Ceilin...

Страница 3: ...ed with a pen Control measurement Shows important measurements during assembly Trowel Shows where the clay mortar is placed Rendered areas Shows the areas that shall be rendered with clay mortar Saw S...

Страница 4: ...parations Measurement for 150 mm flue pipe connection Top connection 2190 mm Rear connection c c 2115 mm Measurement for 125 mm combustion air inlet connection min 15 mm 560 mm 340 mm 125 mm Combustib...

Страница 5: ...3a 2 1 6 6 6 6 6a 7 2 8 8 8 8 8 10 11 11 12 12a No joints 1 17 shows the numbers of all parts see page 6 Control and guide measurements all measurements in mm Outer mantle Inner core Control measureme...

Страница 6: ...GABRIEL KERAMIK AB 6 Start A 5 4 3 3 3 3 3a 3 2 1 17 16 15 14 13 9 9 9 9 9 9 9 9 9 8 7 6a 6 6 6 6 8 8 8 8 8 11 11 12a 12 10 Overall installation sequence...

Страница 7: ...ck layer of mortar on the prepared floor Make sure the regu lation distance to the wall is kept Level vertically and horizontally Check the distance to the wall min 50 mm Set the firebox block 2 with...

Страница 8: ...he contact surfaces with a squeezed sponge Set the firebox block 6 with mortar The firebox block must not touch the outer rings the firebox block must be allowed to expand freely without affecting the...

Страница 9: ...bly Set the second firebox block 6 on top of the first one Make sure that no mortar falls between the blocks Seal with insulation at the front edge of the U formed blocks Level vertically and horizont...

Страница 10: ...Set the outer ring 3 with mortar Level vertically and horizontally Make sure that no mortar falls into the expansion gap at the back of the firebox blocks Set the fourth firebox block 6 on top of the...

Страница 11: ...box block 6a on top of the fourth one Make sure that no mortar falls between the blocks Seal with insulation at the front edge of the U formed blocks Level vertically and horizontally Note Remove any...

Страница 12: ...e firebox top block as shown in the picture This will enable you to continue without disturb ing the vertical measure ments as you progress The support will also be of help when tiling above the fireb...

Страница 13: ...ngs and inner blocks must not be in contact Level vertically and horizontally Check the control measurements see page 5 For a better joint wipe the contact surfaces of the outer rings with a squeezed...

Страница 14: ...r Level vertically and horizontally Set the church roof 10 Level vertically and horizontally Place a thin strip of insulation 2 3 mm between the block and outer ring to prevent soot accumulation Set t...

Страница 15: ...1 mm 9 12 9 24 25 26 Assembly Set outer ring 9 with mortar Level vertically and horizontally Set the divider block 12 in mortar Level vertically and horizontally Set outer ring 9 with mortar Level ver...

Страница 16: ...ave enough space for the whole inner core to expand upwards Place the allocated insulation strip on top of the divider and flame protection blocks Smear a small string of wet mortar just to fix the in...

Страница 17: ...endered with clay mortar easiest done before the assembly Top flue connection Set the blocks 15 with mortar Join the two blocks together with the heat resistant silicon or mortar Rear flue connection...

Страница 18: ...18 16 33 34 17 35 17 Set the small lid 16 in mortar If needed cut to size for the either of the two flue pipe installations Assembly The supporting pieces 17 shall be adjusted according to the size o...

Страница 19: ...at the bent edge is towards the stove body Screw it together with the lower heat plate 20 as shown Place the brackets 18 on the top of the stove secure with silicon When the stove body assembly is com...

Страница 20: ...de with tolerance and joints could vary accordingly The overall appearance is important We recommend wooden wedges Seal with adhesive between tiles and body around the firebox and the soot holes Do no...

Страница 21: ...ist ca 2mm Applicera fix med tandspackel b de p stomme och kakel enligt bild Loda in centrum Att t nka p Loda in mitten Applicera fix b de p stomme och kakel med en tandspackel ca 8 mm stommen och tv...

Страница 22: ...e distance to the wall 2 Tile around the fireplace Measure and check the diagonals so that they are equal Make sure that the tiles are level and plumb by placing a level on both tiles M and Nr 1 and M...

Страница 23: ...B 23 Tiling Assembly Nr 16 Nr 15 Nr 14 Nr 1 Nr 2 Nr 11 A Nr 11 A M M Nr 4 Nr 5 Nr 6 Nr 16 Nr 15 Nr 14 Nr 9 Nr 10 Nr 3 Nr 12 B A A B A A B 2 1 3 4 5 6 7 8 9 10 11 Mortar Shelf Picture 6 Picture 7 Start...

Страница 24: ...hole same size as the hole in the fire box block Fit in the cassette so that the steel flanges round the cassette are inside the tiles and the brass frame is in contact with the tiles Note If the cass...

Страница 25: ...d stoves Pass the flexible tube through the hole in the cassette bottom and fit it over the connecting flange and fasten the flange plaate Mount the damper in the bottom of the cassette do not forget...

Страница 26: ...ition pull it out again approx 20 mm and apply a silicon string just inside the edge around the brass frame then push the cassette back in Even the seal with a wet finger to dip the finger in water wi...

Страница 27: ...not pushed to far in as it will restrict the inlet convection air flow to the cassette Press the fan carefully into the pre cut hole in the sealing block Note The fan must be moun ted so that air is...

Страница 28: ...esistant material for long lasting heat radiation Fan controlled direct heat through channels in the hot air cassette for efficient heat circulation Connection for combustion air from the outside The...

Отзывы: