GABRIEL KERAMIK AB
16
12a
11
13
27
28
29
Assembly
Set the “flame protection” block
(11) and the “divider” block (12a)
with mortar.
Level vertically and horizontally.
The “divider” block (12a) and
“flame protection” block (11) must
be 2-4 mm below the outer ring to
leave enough space for the whole
inner core to expand upwards.
Place the allocated insulation strip
on top of the “divider” and “flame
protection” blocks.
Smear a small string of wet mortar
just to fix the insulation to the fol-
lowing top lid.
The insulation shall function as an
expansion gap towards the divider
so that the inner block can move
vertically.
Set the top lid (13) with mortar.
Level vertically and horizontally.
Don´t forget the insulation
strips.