background image

%

%

&

&

In

st

al

la

ti

o

n

S

ta

ge

  3

 

Page 7 of 18 // email [email protected]  tel: +44 (0) 1438 833577  fax: +44 (0) 1438 833565

CHT - Ceiling Hinge Telescopic

Fix the mount plates in the positions
shown. 27mm behind the back of the
opening.
22mm above the bottom of the finished
ceiling level.

Option 2

Section CC - 1:8

Section BB - 1:8

27mm

27mm

22

m

m

22

m

m

Viewing Side

View on right beam

View on left beam

Содержание CHT Series

Страница 1: ...fax 44 0 1438 833565 ISSUE 003 InstallationInstructions Thank you for choosing futureautomation CHT CeilingHingeTelescopic Models CHT4 5 Design Highlights Near Silent Motor System Modular Format Ensures Simple Installation Range Of Standard Sizes Sized To Suit Options Available ...

Страница 2: ...n result in serious personal injury or damage to equipment Future Sound Vision trading as Future Automation intend to make this and all documentation as accurate as possible However Future Automation makes no claim that the information contained herein covers all details conditions or variations nor does it provide for every possible contingency in connection with the installation or use of this p...

Страница 3: ...allation Option 1 5 Stage 2 Installation Option 2 6 Deciding Which Way To Fix The Mechanism 6 Stage 3 Mechanism Installation 7 Stage 4 Securing The Mechanism 8 Stage 5 Running Screen Cables 9 Stage 6 Fixing The Box Not Needed For Option 1 10 Stage 7 Fixing The Screen 11 Service Details Adjustments Trim Panels 12 Electrical Connections Electrical Connections In The Control Box 13 Contact Closure 14...

Страница 4: ...e 3 of 18 email info futureautomation co uk tel 44 0 1438 833577 fax 44 0 1438 833565 CHT CeilingHingeTelescopic Tool Indicator Icons 1 2 3 4 5 6 1 Drill 3 Allen Keys 5 Screwdrivers 7 Pencil 2 Tape measure 4 Spirit Level 6 Spanners 8 Saw 7 8 ...

Страница 5: ...ontents 1 Mechanism 1 1 Box 1 2 Top Trim 1 3 Left Trim 1 4 Right Trim 1 5 Main Tray 1 6 Cross Bars 1 7 Screen Uprights 1 8 Pivot Tube 1 9 Mount Plates 2 Control Box 3 IR Remote Control Not Shown On Page 4 x2 AAA Batteries 5 Mains Power Other Leads 6 Transformer for Control box 2 Nuts Bolts Multipack Various Fixing s 1 1 1 1 2 1 3 1 5 1 6 1 7 1 8 1 4 1 9 1 9 ...

Страница 6: ...are going to use switch control See operations page Control box setup Before you start check the following The product is in good condition No damage to any parts Wiring is all secure The unit is in the closed position Test the mechanism by running it up and down best done with it upside down on the floor See page 13 16 for controls You must remove the Main Tray by loosening the 2 or 4 hex head bo...

Страница 7: ...sm installation Option 2 Remove side Mount Plates and mount in the correct place within the enclosure as shown to the left See next page for location details Mount plates Box removal Open mechanism to roughly 20 degrees undo all the bolts within the box and then slide off See CHT Tech for beam and opening details If option 1 is chosen to mount the mechanism you can now turn to installation stage 5...

Страница 8: ...7 fax 44 0 1438 833565 CHT CeilingHingeTelescopic Fix the mount plates in the positions shown 27mm behind the back of the opening 22mm above the bottom of the finished ceiling level Option 2 Section CC 1 8 Section BB 1 8 27mm 27mm 22mm 22mm Viewing Side View on right beam View on left beam ...

Страница 9: ...chanism Option 2 Then lift the mechanism into place and slide apart to lock in place 4 no M8 bolts need loosening so that the mechanism can telescope in and fit into the recess Then telescope out and tighten the bolts to secure Gearbox Fix the mechanism in place with 6 bolts that held it to the mount plates when sent CHT option Ceiling Hinge Telescopic ...

Страница 10: ...escopic Running screen cables The mechanism has cable management through the pivot tube Screen cables can be run in at one end of the pivot tube and exit through a slot in its middle to go straight to the back of the screen being mounted The control box needs to be stored in an easily accessible location CHT Mechanism Cable Route ...

Страница 11: ...allation Stage 6 Approx Set the screen frame at about 20 degrees from the up position The box can then be lifted into place When in place secure with the row of 4 bolts along the back M5x25mm and 2 M8 bolts on each side as removed previously Slide box up over screen mount and hook into place You wont be able to slide the box on or off with the Main Tray still on ...

Страница 12: ...en Make sure mechanism is in the OUT position then remove the slotted hook on uprights and bolt them both to the back of the screen Fixing the screen The screen can then be hooked on to the bars and retaining collars can be fitted to secure the screen Operate the mechanism with caution once the screen is in place Make sure it can t hit the edge of the box on the way up Then connect the signal cabl...

Страница 13: ...it shuts for the first time Cover the STOP button just incase the cover panel doesn t line up To adjust the telescopic height see Operation Buttons on page 16 Right Trim Left Trim Task Order 1 Box on 2 Top trim on 3 Right trim on 4 Mount screen 5 Connect screen 6 Attach main tray 7 Adjust up position 8 Left trim on Main tray To adjust the height of the mechanism in the closed position turn the 10m...

Страница 14: ...onnections Control Box Connect infrared sensor here Connect the control box to the DC power supply and the power supply to the mains Page 13 of 18 email info futureautomation co uk tel 44 0 1438 833577 fax 44 0 1438 833565 CHT CeilingHingeTelescopic ...

Страница 15: ...12V SUPPLY 12V SUPPLY CURRENT LIMITED W G W O 2 12V LATCH When 12V attached device will go OUT to 90 degrees When 12V removed device will go IN G O 3 GROUND GROUND W O W G 4 PIN 4 NOT USED BL BL 5 DEVICE LATCH Short to GROUND pin 3 device will go OUT to 90 degrees When short removed device will go IN W BL W BL LED 4 6 DEVICE STOP Momentary short to GROUND pin 3 stops device in current position O G...

Страница 16: ...ud rate 9600 Stop bit 1 Parity None Databits 8 Pin 1 RX Pin 6 TX Pin 3 4 GROUND Pin 2 TX Pin 3 RX Pin 5 GROUND IMPORTANT Ensure protocol is entered exactly as written including Carriage Return Enter ASCII 13 RJ25 9 PIN D PIN 1 RX TO PIN 2 TX PIN 6 TX TO PIN 3 RX PIN 3 GROUND TO PIN 5 GROUND PIN 4 GROUND TO PIN 5 GROUND COMMAND ACTION fa_in Carriage Return Enter Device IN fa_out Carriage Return Ent...

Страница 17: ... provided within the packaging Out Lowers the screen into open out position In Takes the screen into the closed in position Stop Will stop the operation at any point Operation Buttons Replacing batteries Note Only buttons indicated are functional with the product Any button pressed when in motion mechanism will stop Telescopic Adjustment Store C Stores current position when stopped Store B Clears ...

Страница 18: ...ax 44 0 1438 833565 CHT CeilingHingeTelescopic For information on our products please refer to our web site www futureautomation co uk or for questions on installations and our product range please phone us on 44 0 1438 833577 and ask for our technical support department Trouble Shooting ...

Страница 19: ...Page 18 of 18 email info futureautomation co uk tel 44 0 1438 833577 fax 44 0 1438 833565 Notes CHT CeilingHingeTelescopic Notes ...

Страница 20: ...re Automation Unit 2 Kimpton Enterprise Park Claggy Road Kimpton Hertfordshire SG4 8HP United Kingdom Tel 44 0 1438 833 577 Fax 44 0 1438 833 565 Email info futureautomation co uk www futureautomation co uk ...

Отзывы: