CHT - Ceiling Hinge Telescopic
Decide which way to fix the mechanism
One option is to hang the
mechanism from 4 bolts fixed
to the top of the mount plates.
(See CHT Tech for dimensions)
Holes for hanging
mechanism
Mechanism installation Option 1
Mechanism installation Option 2
Remove side Mount Plates
and mount in the correct
place within the enclosure
as shown to the left.
See next page for location
details.
Mount plates
Box removal.
Open mechanism to roughly 20 degrees, undo
all the bolts within the box and then slide off.
(See CHT Tech for beam and opening details).
If option 1 is chosen to mount
the mechanism you can now
turn to installation stage 5 -
Running screen cables.
The second option is to remove the left
and right mount plates and secure them
within the enclosure.