8. INSTALLATION
8-15
4) Connect the cables to the waterproof relay box.
Connect the CAN cable (FRU-NMEA-PFF-060) included to the cable replace-
ment kit and the cable for GS-1001 (MJ-A10SPF0015-150C/300C) to the inter-
nal terminal box.
5) Fit the rubber bush, ring and cap, in that order. Make sure the order is as shown
in the below figure, to keep the IP rating.
6) Fit the cover to the waterproof relay box, then secure the cover with the four
washer screws removed at step 1.
FRU-NMEA-PFF-060
FRU-NMEA-PFF-060
Waterproof Relay Box (JPBS06)
Waterproof Relay Box (JPBS06)
MJ-A10SPF0015-150C/300C
MJ-A10SPF0015-150C/300C
Cap
Ring
Rubber bush
Waterproof Relay Box
Cap
Содержание GS-100
Страница 1: ...SATELLITE SPEED LOG GS 100 OPERATOR S MANUAL www furuno com Model ...
Страница 14: ...EQUIPMENT LISTS xii This page is intentionally left blank ...
Страница 54: ...5 ALERTS 5 8 This page is intentionally left blank ...
Страница 78: ...7 MAINTENANCE TROUBLESHOOTING 7 10 This page is intentionally left blank ...
Страница 118: ...AP 10 APPENDIX 3 TIME DIFFERENCES ...
Страница 147: ...13 Feb 2014 H MAKI D 1 ...
Страница 148: ...13 Feb 2014 H MAKI D 2 ...
Страница 149: ...13 Feb 2014 H MAKI D 3 ...
Страница 150: ...D 4 24 Jan 2018 H MAKI ...
Страница 151: ...13 Feb 2014 H MAKI D 5 ...
Страница 152: ...D 6 ...
Страница 153: ...18 Dec 2012 Y NISHIYAMA D 7 ...
Страница 157: ......