www.furuno.com
All brand and product names are trademarks, registered trademarks or service marks of their respective holders.
Installation Manual
Color Scanning Sonar
Model
FSV-85-MARK-2
SAFETY INSTRUCTIONS ........................i
SYSTEM CONFIGURATION ..................iii
EQUIPMENT LISTS.................................v
1. HOW TO INSTALL THE SYSTEM ..1-1
1.1 Hull Unit ..............................................1-1
1.2 Processor Unit ..................................1-11
1.3 Control Unit .......................................1-12
1.4 Transceiver Unit................................1-17
1.5 Raise/Lower Control Box .................1-18
1.6 Control Box Extension Box ..............1-19
1.7 Attachment Kit (option) .....................1-19
1.8 How to Fill the Soundome with
Antifreeze..........................................1-21
1.9 FRP Tank (option).............................1-22
1.10 Sub Control Unit (option) ..................1-24
2. WIRING............................................2-1
2.1 How to Use the Crimping Tool,
Pin Extractor .......................................2-1
2.2 How to Connect Units .........................2-2
2.3 Processor Unit ....................................2-5
2.4 Control Unit .......................................2-11
2.5 Transceiver Unit................................2-12
2.6 Raise/Lower Control Box ..................2-16
2.7 Control Box Extension Box ...............2-18
3. ADJUSTMENTS AND CHECKS .....3-1
3.1 How to Access the System Menu .......3-1
3.2 How to Change the Displayed
Language ............................................3-1
3.3 Selecting Monitor Resolution ..............3-2
3.4 How to Set Up for Two Monitors .........3-3
3.5 How to Set Up a Vertical Monitor........3-4
3.6 How to Change the Frequency
Setting.................................................3-4
3.7 How to Register the Transducer
Position ...............................................3-5
3.8 How to Check the Hull Unit .................3-6
3.9 How to Adjust the Heading .................3-9
3.10 How to Configure the Own Ship
Mark ..................................................3-10
3.11 Others Menu .....................................3-11
APPENDIX 1 JIS CABLE GUIDE.....AP-1
APPENDIX 2 INSTALLATION
PACKING LISTS ................................. A-1
OUTLINE DRAWINGS ........................ D-1
INTERCONNECTION DIAGRAMS ..... S-1
Содержание FSV-85-MARK-2
Страница 34: ...1 HOW TO INSTALL THE SYSTEM 1 26 This page is intentionally left blank ...
Страница 58: ...2 WIRING 2 24 This page is intentionally left blank ...
Страница 86: ...D 1 7 Jul 2021 H MAKI ...
Страница 87: ...D 2 7 Jul 2021 H MAKI ...
Страница 88: ...D 3 7 Jul 2021 H MAKI ...
Страница 89: ...D 4 7 Jul 2021 H MAKI ...
Страница 90: ...D 5 7 Jul 2021 H MAKI ...
Страница 91: ...D 6 7 Jul 2021 H MAKI ...
Страница 92: ...22 Apr 2014 H MAKI D 7 ...
Страница 93: ...D 8 24 Jun 2021 H MAKI ...
Страница 94: ...D 9 24 Mar 2021 H MAKI ...
Страница 95: ...D 10 24 Jun 2021 H MAKI ...
Страница 96: ...D 11 24 Jun 2021 H MAKI ...
Страница 98: ...D 13 17 Feb 2021 H MAKI ...
Страница 99: ...28 Apr 2018 H MAKI D 14 ...
Страница 100: ...D 15 13 Sep 2011 Y NISHIYAMA ...
Страница 101: ...D 16 13 Sep 2011 Y NISHIYAMA ...
Страница 102: ...D 17 13 Sep 2011 Y NISHIYAMA ...