2. WIRING
2-19
2.7.1
Cable clamp location
Secure all connected cabling in the cable clamp, referring to the following figure.
2.7.2
How to connect the fans and inertial measurement unit to the
control box extension box
When using the control box extension box, the fans and inertial measurement unit
from the raise/lower control box must be installed in the control box extension box. Fol-
low the procedure below.
How to remove the fans and inertial measurement unit from the raise/lower
control box
1. Unfasten six screws to remove the front
cover.
2. Unfasten four screws to remove the top
cover.
10S10027
10S10029
10S10028
Cables from hull unit
LMT_SW
Emergency stop button
Shaft brake
motor
Cables from raise/lower control box
Rotary encoder
IV-8sq
Ship's ground
Top cover
Raise/lower control box
Front cover
Содержание FSV-85-MARK-2
Страница 34: ...1 HOW TO INSTALL THE SYSTEM 1 26 This page is intentionally left blank ...
Страница 58: ...2 WIRING 2 24 This page is intentionally left blank ...
Страница 86: ...D 1 7 Jul 2021 H MAKI ...
Страница 87: ...D 2 7 Jul 2021 H MAKI ...
Страница 88: ...D 3 7 Jul 2021 H MAKI ...
Страница 89: ...D 4 7 Jul 2021 H MAKI ...
Страница 90: ...D 5 7 Jul 2021 H MAKI ...
Страница 91: ...D 6 7 Jul 2021 H MAKI ...
Страница 92: ...22 Apr 2014 H MAKI D 7 ...
Страница 93: ...D 8 24 Jun 2021 H MAKI ...
Страница 94: ...D 9 24 Mar 2021 H MAKI ...
Страница 95: ...D 10 24 Jun 2021 H MAKI ...
Страница 96: ...D 11 24 Jun 2021 H MAKI ...
Страница 98: ...D 13 17 Feb 2021 H MAKI ...
Страница 99: ...28 Apr 2018 H MAKI D 14 ...
Страница 100: ...D 15 13 Sep 2011 Y NISHIYAMA ...
Страница 101: ...D 16 13 Sep 2011 Y NISHIYAMA ...
Страница 102: ...D 17 13 Sep 2011 Y NISHIYAMA ...