50
BASIC OPERATION
■
BASIC OPERATION
INITIAL SCREEN
※
Indicates Each Key
Manual
+100
kPa
Ready Group No 00
RDY
Lamp On
MANUAL
Operation Status
Initial
Screen
Operation
Possible
SET
Pass 0000 1/5p Gp 00
Delay 000.1 sec
Charge1 000.1 sec
Charge2 000.1 sec
Balance1 000.1 sec
Balance2 000.1 sec
Pass 0000 2/5p Gp 00
Detect 00.1 sec
Exhaust 001.0 sec
F Detect 008.0 sec
W. Volume 5.000E2 ml
M.Volume0 2.997E1ml
Pass 0000 3/5p Gp 00
+NG 00.01 ml/m
+2NG 00.01 ml/m
-NG -00.01 ml/m
F+NG 00.01ml/m
F-NG -00.01ml/m
Pass 0000 4/5p Gp 00
Digit 00.0 ml/m
Lead P 100 kPa
Test P 100 kPa
Fitting Set 0
RevData +00.00ml/m
BUBL
100
kPa
Bubl
MAI
NT
Pass 0000
Maintenance
ENT
ENT
ENT
Maint 1/2P
*Volume Measurement
I/O Check
Self Check
Stability Check
Soft Version
Please input value
Flow Master ????? ml/m
ENT
Input the Flow Master’s current FS
value
START
1st Time: Work Variation condition
measurement
2
nd
Time: Actual leak measured by the Flow
Master
Volume ????E? ml
Start key
→
Data Update
Stop key
→
Cancel
START
:
Input value changes when selected.
STOP
:
Returns to READY when selected.
*Err message will be indicated if an error
is generated.
I/O check 1/3 INPUT
STOP gp 1
Psw
START gp 2 ENG
FITTING gp 4 LM1
BUBL gp 8 LM2
RETRY cal
I/O check 2/3 OUTPUT
*OK PNG NC
+NG RUN M/R
-NG RDY
NG2 END
BNG ERR
I/O check 3/3 OUTPUT
SV 1 SV 6
SV 2 SV 7
SV 3 SV 8
SV 4
SV 5
Self Check
1 Cal Port Open
2 Valve Close
3 Press Start Key
Software Version 1.
**
Range M
ENT
ENT
ENT
ENT
START: Starts the self-check process
*ERR is indicated if a malfunction is
detected.
Stability Check
1 Valve Close
2 Press Start Key
ENT
START: Element stability confirmation
FITTING
Fitting Testing
Test result
START
Ordinary Testing
Test result
Maint 2/2P
*Data Load
APU tuning
CalOpen Test
ENT
Outputs the test data
Volume Measurement
* Flow Master
Calibrator
ENT
ENT
When the cursor points at the item:
Move to upper item
Move back to the
previous item.
Moves to the
following item.
Move to lower item
When the cursor points at the item.
Raise numerical value
Lower numerical value
Move up
one row
Move down
one
row
MANUAL & READY
STATUS
Pressure at START, stop at STOP
Pass 0000 5/5p Gp 00
OutData 0
Remote Stop 0
UnitChange ml/min kPa
Cylinder 00
Password
****
ENT
Содержание FL-601 Series
Страница 10: ...9 OUTLINE ...
Страница 17: ...16 OUTLINE ADDITIONAL EQUIPMENT MEMO ...
Страница 18: ...17 PRINCIPLE ...
Страница 24: ...23 POWER ON PROCEDURE ...
Страница 50: ...49 BASIC OPERATION ...
Страница 59: ...58 TESTING OPERATION ...
Страница 68: ...67 MAINTNANCE FUNCTIONS ...
Страница 92: ...91 OPTIONAL EQUIPMENT ...
Страница 108: ...111 SUPPLEMENT ...
Страница 112: ...111 SUPPLEMENT ...
Страница 116: ...115 SUPPLEMENT Pneumatic Circuit Diagram FL 601UL L M H1Pneumatic Circuit Diagram ...
Страница 119: ...118 SUPPLEMENT Pneumatic Circuit Diagram ChargeBypassUnit CBU 600C Exhaust Valve ...