
28
Upgrade and Maintenance Manual
CX2550/60/70 M4
Before you start
2.2
Average task duration
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
For an overview of steps taken into account for calculating the average task
duration, see
Average task duration: 10 minutes
Step
included
Explanation
Server node
shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance see section
.
Server enclosure
removal,
disassembly
yes
Making the server node available, removing
the server node from the server enclosure
(if applicable).
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, server
enclosure
installation
yes
Reassembling the server node, installing
the server node in the server enclosure (if
applicable).
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
Содержание PRIMERGY CX2550 M4
Страница 6: ...6 Upgrade and Maintenance Manual CX2550 60 70 M4 ...
Страница 20: ...Upgrade and Maintenance Manual CX2550 60 70 M4 Contents ...
Страница 46: ...46 Upgrade and Maintenance Manual CX2550 60 70 M4 Important information ...
Страница 70: ...70 Upgrade and Maintenance Manual CX2550 60 70 M4 Basic hardware procedures ...
Страница 114: ...114 Upgrade and Maintenance Manual CX2550 60 70 M4 Expansion cards and OCP mezzanine cards ...
Страница 182: ...182 Upgrade and Maintenance Manual CX2550 60 70 M4 Expansion cards and OCP mezzanine cards ...
Страница 192: ...192 Upgrade and Maintenance Manual CX2550 60 70 M4 Main memory Figure 85 Memory dummy module ...
Страница 204: ...204 Upgrade and Maintenance Manual CX2550 60 70 M4 Main memory ...
Страница 320: ...320 Upgrade and Maintenance Manual CX2550 60 70 M4 System board and components ...
Страница 356: ...356 Upgrade and Maintenance Manual CX2550 60 70 M4 GPGPU extension tray ...
Страница 418: ...418 Upgrade and Maintenance Manual CX2550 60 70 M4 SXM2 extension tray ...
Страница 454: ...454 Upgrade and Maintenance Manual CX2550 60 70 M4 Appendix ...