When turning on the chassis' main power, the Storage Blade works in conjunction with
connected Server Blade power operations. Normally, the power of the Storage Blade and
Server Blade are turned on at the same time. The Server Blade's power may turn on
approximately 15 seconds after the Storage Blade's power turns on. This happens
because Sever Blade initialization takes time. This does not mean there is a failure.
4
Press the Server blade power switch.
Server Blade is activated.
When the power is turned on, the Server Blade
performs Power On Self Tests (POST).
If any abnormalities are detected by POST, error
messages are displayed.
→
"User's Guide 9.2 Troubleshooting"
When Server Blade is set to network activation (PXE), after turning on the main power supply of the
Chassis, wait at least one minute before turning on the power of the Server Blade.
In that time, the Switch Blade is not completely activated or the reconfiguration of the network is not
complete.
Server blade
power LED
turns green
Server blade power switch